Theperformanceofafullfacetunnelboringmachine(TBM.PDFVIP

Theperformanceofafullfacetunnelboringmachine(TBM.PDF

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Theperformanceofafullfacetunnelboringmachine(TBM.PDF

Underground Space Use: Analysis of the Past and Lessons for the Future – Erdem Solak (eds) © 2005 Taylor Francis Group, London, ISBN 04 1537 452 9 The performance of a full face tunnel boring machine (TBM) in Tarabya (Istanbul) N. Bilgin, C. Feridunoglu D. Tumac Istanbul Technical University, Mining Engineering Department, Istanbul, Turkey M. Cnar, Y. Palakci, O. Gunduz L. Ozyol Tinsa Co., Istanbul, Turkey ABSTRACT: The performance of a full face tunnel boring machine (Herrenknecht TBM) was evaluated within the research program of this study. TBM having a diameter of 2.9 m and cutting power of 560 kW was used to excavate the tunnel of 13270 m in length, which was situated between Sariyer and Baltaliman. The main rock formations are Paleozoic aged sedimentary rocks, limestone, sandstone-siltstone, andesite dykes and sed- iment fillings. The project was commissioned to Tinsa – Öztas¸ – Hazinedarog lu – Simelko consortium. The performance of TBM was recorded continuously for detailed shift analysis. A limestone block having dimen- sions of 0.4 0.5 0.4 m, representing majority of the rock formations was collected from one of the shafts. This rock block was subjected to full scale instrumented laboratory cutting tests using a disc cutter taken from the TBM. The relationship between thrust force and depth of cut was compared to the one obtained in the field. It is concluded that accumulated data and instrumented full scale rock cutting tests may serve as a valuable tool to predict the performance of full face tunnel boring machines in any type of rock formation. 1 INTRODUCTION It is estimated that in the coming years the under- ground construction in Europe and in the other parts of the world will increase tremendously, typical exam- ples

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档