寺河矿大采高超长工作面矿压显现规律的研究.pdf

寺河矿大采高超长工作面矿压显现规律的研究.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Abstract With the increasement of coalface length becoming another main technology for mines to acquire high production and high efficiency of the centralized production, numerous mines in China try to aggrandize the length of coalface. Currently, the coalface length of sihe mine of Jincheng Coal Mining Group has been 300m, along with this trend, it has become an urgent problem to be solved to research into regulations of coal-pressure manifestation of the overlength coalface and the regulations of migration of the overlying rock. This paper has 4301 initial mining fully mechanized working face of NO.4 panel in the east in sihe mine as its engineering background, with the combinative measures of site ground pressure monitoring, theoretical analysis, equivalent material simulating and numerical simulation, this paper deals with the study of the regulations of coal-pressure manifestation of 300m coalface in sihe coal mine which is under the condition of high mining height and deep burial depth, as well as the structure of the overlying rock strata and its movement characters. By means of site ground pressure monitoring and analysis of the regulations of coal-pressure manifestation of the working face, it turns out that the coal roof weighting step has been shorter and the weighting strength has been more moderate when the length of working face of sihe mine changes from former 225m to 300m, and it also finds that 300m working face has enlarged its advanced influenced range and the

文档评论(0)

hblybd123 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档