论深基坑工程的监理.doc
论深基坑工程的监理
摘 要:建筑深基坑过程的施工是一个循序渐进的过程,监理人员要监督施工单位按程序施工,做到先设计后施工、边施工边监测,遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的原则,对整个深基坑施工过程实现一个有力的控制,保证工程顺利、安全地完成。
关键词:深基坑支护工程;监理;控制
Abstract: The construction of deep foundation pit construction process is a gradual process, the supervisors to supervise the construction unit according to the procedure of construction, so that the first design, construction, construction monitoring, follow the stratified excavation, support after the first cut, cut support, symmetry and equilibrium, limit principle, to the deep the foundation pit construction process to achieve a po