- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Configuration and maintenance of the ARIES-ST power plant.doc
CONFIGURATION AND MAINTENANCE OF THE ARIES-ST POWER PLANT
X.R. Wang,a M.S. Tillack,a F.Najmabadi,a S. Malangb and the ARIES Team
aFusion Energy Research Program, University of California, San Diego, La Jolla, CA 92093-0417
bForschungszentrum Karlsruhe GmbH, Postfach 3640, D-76021 Karlsruhe, Germany
Abstract- ARIES-ST is a 1000 MWe fusion power plant based on a low aspect ratio spherical torus (ST) plasma. The configuration and maintenance study of ARIES-ST was devoted to develop a credible configuration to accommodate the unique features of a highly-elongated low aspect ratio ST plasma, and to allow rapid replacement of the power core. Emphasis has been placed on design features leading to high overall availability of the power plant. Mechanical joints are possible in the normal conducting single-turn toroidal field (TF) coil system. This enables replacement of the entire power core as one single piece, and a relatively simple blanket and centerpost (CP) replacement scheme. Three general options for the ARIES-ST overall configuration and maintenance scheme have been explored. The final power core design configuration uses vertical maintenance from below.
1. INTRODUCTION
The ARIES-ST maintenance philosophy is based on rapid removal and replacement rather than in-vessel manipulation. The availability of the power plant is maximized by utilizing single piece maintenance of in-vessel components. Components that are known to require frequent scheduled maintenance, e.g., the first wall, divertor plates, and blanket, are integrated as a single replacement unit. This approach is dramatically different from that of an experimental device such as ITER, due to several factors:
Experiments have very low neutron fluence, such that frequent power core replacement is not anticipated.
Availability is not driving motivation behind the design of experiments. Low availability is expected and tolerated.
Mature power plants are assumed to achieve relatively high reliability,
您可能关注的文档
- An Efficient and Resilient Approach to Filtering and.ppt
- An Evaluation of Special Units for Children with Mental.doc
- An experimental study on the examination of springback of.ppt
- An Expert System about Product Component Combine Design.doc
- An Improved Construction for Counting Bloom Filters.ppt
- An Improved Version of the Inverse Hyperanalytic Wavelet.ppt
- An Inquiry into the Nature and Causes of the Wealth of Nations.doc
- An interval portfolio selection problem based on regret.doc
- An introduction to Anthropological Demography.doc
- An Introduction to Latent Semantic Analysis.ppt
- Conflict and its management - OoCities.doc
- CONSIDERATION AND COMPARISON OF DIFFERENT REMOTE SENSING.ppt
- Constant Round Oblivious strongTransferstrong in the Bounded-Storage Model.ppt
- CONSTITUTIONS, INSTITUTIONS AND ECONOMIC CONVERGENCE AN.doc
- Consumer-Driven Health Plans Are They More Than Talk Now.ppt
- Contemporary Labor Economics - iona.edu.ppt
- Contested Identities Using Lacanian Psychoanalysis to Explore.doc
- Context-Dependent Term Relations for Information Retrieval.ppt
- Contextual Teaching in Science - kennesaw.edu.doc
- Contrast induced nephropathy - REVISTA FARMACIA.doc
文档评论(0)