- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* Say: What is it we are trying to achieve with our Material Flow Strategy? Read: “Definition” Say: The purpose of today’s discussion is to explain the main elements of Lean Material Flow * 7 Speaker Notes Before showing this slide, ask participants: What do you think are the main elements of a materials system? What is involved in a materials system. Write answers on a flip chart. Show slide. These are the very basic elements(?? ???? ??) of the lean materials system. The entire process begins when the parts are ordered from our suppliers. The suppliers produce the parts, and package them. A transportation company picks up the parts and delivers it to the plant. The receiving area accepts the parts and delivers them to the temporary storage area. From there, the parts are delivered based on a pull system (i.e. only when needed by the customer) We will look at each one of these elements in a bit more detail now. * Say: Material flow ???? ???? ??? ???? ??. The number of suppliers as well as their distance from GM manufacturing operations plays a large role in the material flow strategy. Ask: What would we ideally like to see? Read: Slide * 12 Speaker Notes ; ?????? ??, ?????, ?? ??? ??. 1. ???? ??? ???? ??, ????/?? ??? ?? The milk run method is where one empty truck goes to several different suppliers and returns to the plant with a full load. (This was named after old fashioned milk deliveries. The milkman goes from house to house to deliver the milk). The milk run is used when we have several suppliers, fairly close together, who supply only a partial truckload of parts, on a frequent basis. In this case it makes sense for one truck to pick up the loads one after another, and finally come back with a full load to the plant. It is important to note that windows of time are set at the suppliers and at the plant. Ask: Does anybody have any idea why we would want to standardize the delivery times? Answer: We need
您可能关注的文档
最近下载
- 曲沃县各级文物保护单位一览表(2021版).docx VIP
- 2025年甘肃省公路交通建设集团武仙公路收费运营人员招聘61人简历怎么投递笔试备考题库及答案解析.docx VIP
- 2025年安徽省淮南市招聘社区工作者考试题(含答案).docx VIP
- 小学新学期开学收心会开学第一课收心主题班会通用PPT.pptx
- 做中文讲师妈妈.doc VIP
- 细胞的基本结构-细胞膜的结构和功能.ppt VIP
- 2025年初中语文九年级上册教学计划及进度表 .pdf VIP
- 部编版小学四年级语文上册教案(全册).pdf VIP
- 2025年甘肃省公路交通建设集团武仙公路收费运营人员招聘61人简历怎么投递笔试备考试题及答案解析.docx VIP
- 高中生物实验探究教学中的跨学科学习研究教学研究课题报告.docx
文档评论(0)