- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设项目招投标阶段工程造价管理研究
Abstract
With the rapid development of our economy, the construction project investmentis increasing, our project cost from the stage management into the whole process management. Construction unit of the project cost management,including pre construction, the implementation stage and later stagemanagement, the implementation phase includes the design stage, the bidding stage, the construction stage, the completion acceptance and post evaluation stage. And the construction units to the construction project cost managementincluding the bidding stage, the construction stage, the completion acceptancestage management. At present, there are a large number of disputes in the process of project cost management, and the contractor and at a disadvantage,and the work of project cost management contractor is very complex, therefore,this problem has been paid more and more attention. This paper stands in theContractors point of view, in the bill of quantities mode, to discuss the project cost management problem from the following three aspects:
(1) preparation of project bidding is the main problem of bidding, tendering and bidding stage engineering cost management of the main contents include: the compilation of the quantities bill, bidding, contract, contract. Solution method forcase analysis that the main problem.
(2) the rational determination of the construction cost and the effective control is the main problem in construction stage, the main contents of construction cost inEngineering: engineering change management and contract price adjustment,determine the project claim management and compensation expenses, project price adjustment. By case analysis, solution to the main problem.
(3) the project completion settlement is reasonable to determine the main problems of project completion settlement phases, the main contents ofcompletion settlement stage of project cost management: settlement for completion, completion settlement examination. Solution meth
您可能关注的文档
最近下载
- 巴克曼公司产品在石化行业技术应用201508.pdf VIP
- 希腊城邦和亚历山大帝国.pptx VIP
- (2025秋新版)部编版八年级语文上册全册教案.pdf
- 《品质》高尔斯华绥优秀实用详解.ppt VIP
- 2021年初中物理培优(重点高中自主招生 竞赛)难题练习第20章 电与磁.docx VIP
- 《游青城山记》原文及注释及译文及作者介绍及古诗解析及拓展题及答案.docx VIP
- 八年级(上)《三峡》文言知识挖空训练+参考答案+翻译.docx VIP
- 2024年秋新统编版道德与法治七年级上册全册课件(新版教材).pptx
- 公司战略规划模板.ppt
- 生命生态安全一年级下册教学计划 .pdf VIP
文档评论(0)