毕业设计(论文)
类 型: 毕业设计说明书 题 目: 滨海新区丰园苑施工组织设计 学生姓名: XXX 指导教师: XXX 专 业: 建筑工程技术 时 间: 2012.1.10
摘 要
本施工组织设计对目标工期、工程质量、项目管理机构设置、施工进度计划控制、机械设备及周转材料配备、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施、降低成本措施等诸多因素尽可能充分考虑,突出科学性及可行性关键词ABSTRACT
The construction organization design is FengYuan coastal garden C2-C5 building no. Engineering as the research object, the thorough practice and theory with practice, according to the projects characteristics, the design development organizations. Prepare to target period, when the engineering quality, project management organization setup and construction schedule control, mechanical equipment and turnover materials, the main branch sectional works with construction method, safety guarantee measures, civilization construction and environmental protection measures, reduce cost measures, and many other factors fully consider as far as possible, outstanding scientific and feasible.
This design main content includes: construction plan, floor plan of construction, the construction plan and resources organization, configuration. Expounds the construction process of the common problems and solutions, sedate mentioned the construction technology and technical measures to better guide construction, make component project quality, time limit and cost effectively prepaid phone, each phase of the construction in an orderly way.
Keywords: engineering outline; Construction project; Quality security; Civilization construction
目 录
1.施工组织设计编制总说明 8
1.1编制依据 8
1.2编制范围说明 8
1.3工程质量目标 8
1.4建设工期目标 9
1.5其它承诺 9
2 施工现场总平面布置 11
2.1工程概况 11
2.2施工现场总平面布置 11
2.2.1场地布置 11
2.2.2临时设施布置 11
2.2.3施工用上、下水及消防用水布置 12
2.2.4施工用电布置 12
2.2.5机械设备布置 12
2.2.6施工现场总平面布置图(附后) 12
3 施工部署及施工方案简介 13
3.1施工流程 13
3.2主要分项的施工方法简介 13
3.2.1桩基施工 13
3.2.2围护工程 13
3.2.3土方工程 13
3.2.4模板工程 13
4 确保工程进度的技术保证措施 14
4.1工期安排 14
4.2确保工期的主要管理技术措施 14
4.3施工总进度计划控制 14
4.4保证实现施工总进度计划的措施 15
4.5确保工期实施的具体措施 15
4.5.1土方工期的控制 15
4.5.2钢筋工程施工工期控制 15
4.5.3砼工程施工工期控制 15
4.5.4模板工程工期控制 16
4.6控制施工工期的奖罚措施 16
5 主要分部分项工程的施工技术方案