- 12
- 0
- 约8千字
- 约 32页
- 2016-06-21 发布于湖北
- 举报
CM - 38/0 Code, Speed 33 km/h Proceed Lamp OFF Target Speed 0 Actual Speed 33 km/h Overspeed Warning ON Buzzer Zero Target Speed ON CM - 38/0 Code, Speed 0 km/h Proceed Lamp OFF Target Speed 0 Actual Speed Reduced To 0 km/h Overspeed Warning OFF Zero Target Speed ON * * The actual train speed in continuously monitored and compared with the Maximum Safe Speed (MSS) provided by the track circuits. When the train speed achieves a configurable value under this MSS, the traction of the train is removed. If the train speed achieves the MSS, the Emergency Brake is applied. The ATP prov
您可能关注的文档
最近下载
- T /GDNAS 081—2026 鼻窦负压置换技术规范.pdf VIP
- [宁波市]2025年浙江宁波市海曙区面向应届优秀高校毕业生选聘紧缺优秀人才30名笔试历年参考题库典型.docx VIP
- 山地用小型荞麦播种机动力、传动、行走及功能转换机构的设计【全套cad图纸】.doc VIP
- 2026中考语文文言文九大主题对比整合梳理(附真题).doc VIP
- 2026年 中考语文一轮复习:文言文阅读——山水游记类.pptx VIP
- 设备基础工程监理细则.pdf VIP
- 河道及湖泊清淤施工組织设计书.doc VIP
- 2024版个人征信详版(可编辑-带水印).pptx VIP
- 中国翼状胬肉诊疗指南(2026版).docx VIP
- 征信报告模板详细版带水印可编辑2025年9月新版.pdf VIP
原创力文档

文档评论(0)