- 1、本文档共78页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
每套公寓均设有卫生间,内设有坐式大便器、淋浴、洗脸盆各一个。1,2层商场设有公共卫生间。各层建筑面积不同,地下室层高为3.9m和3.6m。1,2层层高为5.1m,3至18层层高为3.1m,建筑总高度为66m。根据建筑物性质、用途及建筑单位要求,室内设有完善的给水排水卫生设备系统,安全可靠的消防给水系统,设置独立的消火栓系统及自动喷水系统,每个消火栓箱内设按钮,消防时直接启动消防泵,生活水泵自动启动。本综合楼内的宾馆要求室内热水供应采用全天全循环集中热水供应。
。
preface
The main task of this design is in the center of the city, jiangsu province, including water supply and drainage design of the hotel. This is a complex 26 house floor. 1 to 3 layers for the complex building subsidiary recreation, 4 to 26 floors for hotel guest rooms.
The rooms and suites are equipped with toilet, ther are seated toilets, bathtubs, sinks in each one. Layer construction area is different, the basement height is 4.50 m, the layers of high of 4.50 m, 2 to 3 layers of high of 3.90 m, 4 to 26 layers of high of 3.30 m, building a total height of 88.20 m. Requirements according to the nature of the building, use and construction units, indoor sanitary equipment is equipped with perfect water supply and drainage system, safe and reliable fire protection water supply system, set up independent fire hydrant system and automatic sprinkler system, set button each fire hydrant boxes, fire when directly start the fire pump, water pump automatic start of life. The hotel requirements of this complex indoor hot water supply by centralized hot water supply throughout the whole cycle. This design specification includes construction engineering in the design of the drinking water, drainage, hot water and fire hydrant and sprinkler design projects.
Main contents include the drinking water system design and calculation, the calculation in the design of fire hydrant water supply system, the design calculation of spray system, sewage drainage system design and calculation, the hotel water supply and drainage design and calculation of expansion of preliminary design and indoor hot water supply system.
目录
前言 1
preface 2
第一章 设计说明 4
第一章 设计说明 4
1.1设计任务和设计资料 4
1.1.1设计任务 4
您可能关注的文档
- 免疫对内环境的调节.ppt
- 免疫规划发展历程简介.ppt
- 免疫调节一轮复习学案带答案.doc
- 免疫调节-植物激素习题讲解.ppt
- 免疫学6-T淋巴细胞.ppt
- 免疫学第九章-超敏.ppt
- 免疫学第三章-抗体.ppt
- 面试考官与工作人员职责及工作程序.doc
- 面向对象java语言程序设计第二章xin.ppt
- 灭火器及空气呼吸器.ppt
- DB44_T 2611-2025 城市排水管网有毒有害气体监测与风险分级管理技术标准.pdf
- DB44_T 2612-2025 竞赛类科普活动策划与实施服务规范.pdf
- DB43_T 2947-2024 烟草种子质量控制规程.pdf
- DB37_T 4836-2025 煤矿风量实时监测技术要求.pdf
- 叉车防撞系统,全球前22强生产商排名及市场份额(by QYResearch).docx
- 超滤膜,全球前18强生产商排名及市场份额(by QYResearch).docx
- DB62T 4172-2020 玉米品种 酒623规范.pdf
- DB62T 4160-2020 在用真空绝热深冷压力容器综合性能在线检测方法.pdf
- DB62T 4164-2020 辣椒品种 酒椒1号.pdf
- DB62T 4133-2020 公路隧道地质超前预报机械能无损探测技术规程.pdf
文档评论(0)