网站大量收购独家精品文档,联系QQ:2885784924

ContractorPastPerformanceReport-FloridaDepartmentof.ppt

  1. 1、本文档共58页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ContractorPastPerformanceReport-FloridaDepartmentof.ppt

Rev 07/2004 Contractor Past Performance Rating Ananth Prasad Why the New System? More objective process Communicate performance issues proactively Tied to outcomes that are important to Customers “Raise the bar” on Contractor’s performance Factor in past performance as part of Low-Bid system (e.g. Design-Build) History (for contracts awarded from July 2000 thru’ December 2001) History (for contracts awarded from July 2000 thru’ December 2001) Comparison – Old vs. New Impacts of Past Performance Grades Rule 14-22 Florida Administrative Code Impacts to pre-qualification and bidding capacity. The higher the average score, the higher the bidding capacity. Impacts of Past Performance Grades Contractor past performance score is used to determine bidding capacity. Typically, we use the last years scores to average but under certain circumstances, we can average up to last five years of scores. Year starts from the date of Contractor’s pre-qualification (in most cases, it is April). In any case, a score once used in an average cannot be used again. TAKE IT SERIOUSLY! WE NEED TO BE FAIR AND REASONABLE, BUT STILL, A “GOOD” IS A “GOOD” AND A “BAD” IS A “BAD Bidding Capacity Impacts MCR = AF x CRF x ANW Where, MCR = Maximum Capacity Rating AF = Ability Factor (ranges from 1 to 15) CRF = Current Ratio Factor (ratio of adjusted current assets and adjusted current liabilities) ANW = Adjusted Net Worth (as described in FAC) Ability Factor (revised as part of the new grading system) Ability Factor If a Contractor receives an ability score of 76 or less on two or more past performance reports for projects completed during the 12-month period, the AF will be limited to a maximum of 4 and the use of Surety Letter prohibited, unless the applicant’s average ability score (inclusive of all score received during the period) is 87 or greater. Effect of Past Performance on Maximum Contract Rating The Good and the Bad PROS “pay as you go” approach More objective Escalation process b

文档评论(0)

ailuojue + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档