Sum_C200_VT_DQE Test Plan and Report_10_29_2009

■ C200 EVT(SDV) DQE Test Items Summary Number Items Result 1.1.1 StructureFunction Check 1.1.2 Dust test (Non-Op only) 1.1.3 Chassis Storage Test 1.1.4 Thermal – vent blocking test 1.1.5 Strain Gauge Test 1.1.6 Over turn test 1.2.1 Operation Temp/Hum Cycle Test 1.2.2 High/Low Temperature Power Cycling Test 1.2.3 System Storage Temp/Hum Test 1.2.4 Vapor inspection test (35C 90% 48hr only) 1.2.5 Cold and Warm Boot Test 1.2.6 AC Power Line Margin Test 1.2.7 Guardband test 1.2.9 PCBA Thermal Shock Test Dye penetration test (after PCBA Thermal Shock) 1.3.1 Op S