万科总包单位与甲方定分包单位的工程界面划分
At present, the County personnel totaled 93,000 people, is three times times of 2010. Review the work of the past five years, the County formed to encourage innovation, innovation, participation in innovative atmosphere, a large number of innovations emerging high-level personnel leading the increasingly strong role; innovative idea further innovations gradually expanded from economic to social governance, public safety, intelligence and other areas of urban construction, innovation and talent support becomes increasingly important. Of hard work, the county levels to cherish, continue to consolidate, improve and, for the future development, to remain sober-minded, scientific foresight, courage to play. Under the influence of complicated international and domestic situation, the domestic economic situation, and General Secretary of stability, but downward pressure on large trend of differentiation and deepening of structural adjustment sums up the current situation. From Dongping actual see, Thirteen-Five during, County faced stable economic growth, and deepening structure adjustment of double task, both faced with economic total small, and per capita level low, and industry structure not reasonable, and economic development way extensive, basic situation, more has industry cluster early now prototype, and Park hosted capacity constantly enhanced, and resources traffic location advantage increasingly appeared, and cadres masses innovation venture passion
一、土建部分界面划分
二、公共安装部分界面划分:
三、户内安装部分界面划分
四.精装修项目建筑与室内进度配合指引及界面划分
采用精装修交付的项目区别于毛坯交付的项目,在建筑阶段即需要室内设计的充分配合,进行多次互相提资及互相复核,以达到水电、设备等一次性设计到位的目的,减少重复出图,减少设计变更。
一、在建筑设计阶段需要充分预留合作时间,根据本指引,建筑及室内需要按时互提资料。
二、精装修图纸与建筑图纸的界面划分
建筑图纸与室内图纸交叉部分的划分,原则上,图纸出现交叉部分的,除饰面做法外,全部以建筑图纸为准
五、建筑与室内设计互相提资的顺序及时间
六.项目总包承包范围与专业承包交叉施工界面划分标准
说明:
1、本标准作为户内毛坯交付、公共部位精装修项目的项目总承包范围与其他专业承包交叉施工界面划分;
2、除以下专业承包工程内容外,其他各项工程内容原则上均含在总承包范围以内;
3、以下专业承包内容允许各项目根据具体情况进行局部的合并招标,但是禁止拆分招标。如项目有特殊情况需分拆招标或本标准未包含内容各项目应进行重要事项申报;
4、各承包范围存在交叉界面时尚应明确各前后工序的质量验收权利和义务,确保后续工序不应前道工序质量问题而受
您可能关注的文档
最近下载
- 部编版语文五年级下册第二单元教材解读大单元集体备课.pptx VIP
- 部编版语文五年级下册第一单元教材解读大单元集体备课.pptx VIP
- 车工 (数控车床)理论知识考核要素细目表四级.pdf VIP
- 本科课程《基础护理学》教案,第十二章给药.doc VIP
- 农村题材小品剧本村官.pdf VIP
- 小品剧本-小品《绰号》.docx VIP
- 小品剧本-小品《竞选》.docx VIP
- 本科课程基础护理学教给药教案(2025—2026学年).docx VIP
- LaserjetCP1025系列打印机打印质量故障排除手册.pdf VIP
- 年会小品剧本小品剧本:搞笑小品剧本《都是喝酒惹事》台词大全.docx VIP
原创力文档

文档评论(0)