- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑工程专业英语05SteelFrameConstruction研讨
Unit 5 Steel Frame Construction Part ⅠIllustrated Words and Concepts Figure 5-1 Steel Column Base Details Figure 5-2 Tower Cranes and a Mobile Crane Part Ⅱ Passages Passage A The Construction Process (Fabrication) Passage B The Construction Process (Erection) Unit 5 Steel Frame Construction Part Ⅰ Illustrated Words and Concepts Figure 5-1 Steel Column Base Details Unit 5 Steel Frame Construction Part Ⅰ Illustrated Words and Concepts Figure 5-2 Tower Cranes and a Mobile Crane Unit 5 Steel Frame Construction Part Ⅱ Passages Passage A The Construction Process (Fabrication) A steel building frame begins as a rough sketch on the drafting board of an architect or engineer. As the building design process progresses, the sketch evolves through many stages of drawings and calculations to become a finished set of structural drawings. Unit 5 Steel Frame Construction Part Ⅱ Passages Passage A These show accurate column locations, the shapes and sizes of all the members of the frame, and all the loads of the members, but they do not give the exact length to which each member must be cut to mate with the members it joins, and they do not give details of the more routine connections of the frame. These are left to be worked out by a subsequent recipient of the drawings, the fabricator. Unit 5 Steel Frame Construction Part Ⅱ Passages Passage A The Fabricator The fabricator’s job is to deliver to the construction site steel components that are ready to be assembled without further processing. This work begins with the preparation in the fabricator’s shop of detailed drawings that show exa
文档评论(0)