- 2
- 0
- 约6.46千字
- 约 5页
- 2016-08-15 发布于河南
- 举报
LP-100G English manual
LP-100G English manual
1 Safety Precautions
● Never connect the A.C. power supply to the output terminals (U,V,W) of the frequency converter。
● After the power supply is switched on, do not perform wiring or check, etc.
● If the power supply is switched off, do not touch the PCB or other parts inside the converter within 5 minutes after the keyboard indicator lamp goes off, and you must check by using the instrument that the converter has completely discharged all its capacity before you start to work inside the converter. Otherwise, there will be the danger of electric shock.
● The static electricity in human body will cause serious damage to the MOS field effect transistor in the converter. Please keep your hands away from the PCB, IGBT and other internal parts before taking actions to prevent static electricity. Otherwise, faults may be caused.
● Don’t touch the circuit boards or its parts or components in the converter when it is powered, so as to avoid danger of electric shock.
Please don’t shut off the unit by turning off the power supply. Turn off the power supply after the motor has stopped its operation
2 Connection Precautions
※ Don’t install electromagnetic contactor between the frequency converter and motor.
※ Don’t install input phase capacitance or resistance-capacitance absorbing device between the output terminals U、V、W of the frequency converter.
※ To disassemble or replace the motor, the input power supply must be turned off for the frequency converter.
※ The motor or working power supply with can be switched on/off only after the converter stops its output.
※ In order to minimize the effect of electromagnetic interference, a surge absorbing device should be installed if used electromagnetic contactor and relay, etc. is near to the frequency converter.
※ For external control of frequency converter, a isolation device should be used for the control lines or screened cable should be used.
※ A screened cable sho
您可能关注的文档
- 人教版英语模块四第五单元复习文档BOOK 4 Unit5.doc
- 电压频率交换器.doc
- 3dvr材质参数.doc
- B字母开头的高考词汇.ppt
- translate+ppt.ppt
- 新概念四Lesson 30.ppt
- ECN sample1.doc
- 稳压器简介.doc
- 对shp文件进行坐标系的添加和转换.docx
- 朱琳课件.pptx
- 智能汽车产业深度研究:L3车型产品准入,智能汽车发展加速.docx
- 制冷设备行业2026年度投资策略:产业并购活跃,布局全球化与前沿冷却技术.docx
- 中风领域的发展:关键管道和临床试验见解.docx
- 有色金属行业研究:2026年年度策略:供需重塑与资源再定价.docx
- 2026高一数学寒假自学课(苏教版)专题06 幂函数的图象与性质(2重点+15题型)(解析版).pdf
- 2026高一数学寒假自学课(苏教版)专题03 不等式(5重点+16题型)(解析版).pdf
- 2026高一数学寒假自学课(苏教版)专题11 三角函数图象变换及实际应用(3重点+8题型)(解析版).pdf
- 2026年高二物理寒假自学课(人教版)第07讲 涡流、电磁阻尼和电磁驱动(原卷版).docx
- 2026年高二物理寒假自学课(人教版)第08讲 自感与互感(解析版).docx
- 辽宁省2025中考数学第二章方程(组)与不等式(组)第8课时一元一次不等式(组)及不等式的应用讲课件.pptx
最近下载
- 2025年安徽省中考语文真题试卷(含答案).pdf VIP
- (高清版)-B-T 34590.1-2022 道路车辆 功能安全 第1部分:术语.pdf VIP
- 中职《金属加工与实训》-基础常识与技能训练第四章 金属热加工基础第二节 锻压(一).ppt VIP
- 中职《金属加工与实训》-基础常识与技能训练第四章 金属热加工基础第二节 锻压(二).ppt VIP
- 光伏工程春节后复工方案(3篇).docx VIP
- 2024年江西省高考政治试卷真题(含答案逐题解析).pdf
- (2026春新版)人教版三年级数学下册全册PPT课件.pptx
- 高考学业规划机构服务规范.docx VIP
- 土石方工程居间合同.docx VIP
- (正式版)DB51∕T 3334-2025 《食品追溯码编码技术规范》.pdf VIP
原创力文档

文档评论(0)