- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Plate steel binding requirements
Plate steel binding requirements
Short slab reinforcement assembling to the next, to in the long, on the lower level is the same.
Beam and plate intersect with yi, anchor into the beam slab length meet the minimum anchorage length.
6.2.1.4.7.3.1 reinforced connector location
Column within the channel length are not allowed to overlap, structure of plate steel joints as far as possible to avoid loading parts, at 50% of the same cross section stagger when necessary.
6.2.1.4.7.3.2 reinforced positioning approach
Along the channel direction set floor h steel horse stool, spacing is 2000 mm, the horse stool using Φ 12 reinforced.
6.2.1.5 template engineering
By comparing and combining with the engineering structure features, the construction period and quality requirements, this project of the underground structure template we choose as follows.
Structural parts of the template selection support (reinforced) system
Base plate, pile caps, ground beam brick template
The basement wall coated wood template phi 48 steel tube, wall bolt reinforcement
Frame beam coated wood template bowl scaffold early complete system
Basement coated wood template phi 48 steel pipe roof, wall bolt reinforcement
6.2.1.5.1 caps, basement floor template
6.2.1.5.1.1 floor under cap template
Artificial cleaning the bottom of the router and after finishing cap slope, using the string cable to the center of pile caps is hanged line, steel rule measurement of pile caps, the outside building pile caps slope Angle, and to cement mortar plaster masonry slope Angle, then cushion pouring pile caps, slab concrete construction.
6.2.1.5.1.2 basement wall bottom template
Cushion construction after the completion of foundation slab, the use of electronic theodolite and total station in foundation slab pad axis line of pop, according to the drawings according to have to play good axis line outside return foundation slab, the outside to play good foundation floor single line on the outside
您可能关注的文档
- 滑移装载机.doc
- 余氯.doc
- homework on paragraph.doc
- 氯气安全技术说明书.doc
- 电影中的词汇.doc
- 散杂货货名录.doc
- Exercis3.doc
- 15.Buying_Motives.doc
- Dress collocation knowledge.doc
- 滤色镜下观察到的宝石颜色变化表.doc
- 浙江2025学年第一学期高三12月适应性联考日语含答案.doc
- 江苏省镇江市2025-2026学年高三上学期12月期中质量监测语文试题及参考答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考英语含答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考政治含答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考语文试题含答案.doc
- 浙江2025学年第一学期高三12月适应性联考地理含答案.doc
- 浙江2025学年第一学期高三12月适应性联考历史含答案.doc
- 山东省实验中学2025-2026学年高三上学期第三次诊断性考试数学含答案.doc
- 山东省实验中学2025-2026学年高三上学期第三次诊断性考试物理含答案.doc
- 山西省部分学校2025-2026学年高三上学期12月月考数学试题含答案.doc
原创力文档


文档评论(0)