the skirt floor of central circle diameter of the anchor bolt hole deviation.docVIP

the skirt floor of central circle diameter of the anchor bolt hole deviation.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
the skirt floor of central circle diameter of the anchor bolt hole deviation

the skirt floor of central circle diameter of the anchor bolt hole deviation, two adjacent hole chord length allowed deviation and chord length to allow any two hole deviation allowed is 2 mm. (3) the whole tower in the arrival of the goods of general installation program 1. The installation or assembly on the basis of tower should have been done upon the acceptance of foundation. In the compound, on the basis of the equipment should be based and its surface treatment and conform to the requirements, retest foundation concrete strength shall not be less than 75% of the design strength. 2. The tower installer: tower site inspection acceptance; Op-amp to position requirements; Lug production installation, set the hoisting machine; Acceptance, set pad iron; Integral lifting, alignment, tighten the anchor bolts, shim point solid; Secondary grouting. 7 P117 (4) section of tower in the arrival of the group for the installer on site 1. To installation section for the arrival of the tower group: points lie in basic and bottom-up piecewise group to install two ways. 2. Lie with compound programs: section examination and acceptance of equipment, components and set-up balk at the scene of embankment or set roller frame (roller) assembly is milled and paragraphs tower group for welding (according to the period of shell - middle to lower segment shell, the order of the bottom section of the shell with skirt) into the whole tower - the girth weld of welds on the spot for nondestructive testing. Compound tower columns of the same program and the overall the arrival of the goods after the completion of installation in place, the fixed pieces and other accessories industry leading welding and pressure test, air tightness test. 3. In basic bottom-up piecewise group to install: segmentation based acceptance, examination and acceptance of equipment, components and set up the mat and iron tower of the next paragraph (with skirt) hoisting in place, looking for positive, lifting the seco

文档评论(0)

sb9185sb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档