Double Surface dressing 双表处施工英文版.docVIP

  • 2
  • 0
  • 约 5页
  • 2016-08-21 发布于河南
  • 举报

Double Surface dressing 双表处施工英文版.doc

Double Surface dressing 双表处施工英文版

UPGRADING PERAMIHO JCT TO MBINGA ROAD TO BITUMEN STANDARD Method Statement for Double Surface Dressing Personnel: Team leader 1 (Wang Shizheng) Mr. Zhang will be responsible for the works and all instruction issued on site could be directed to him. He has a good command of English. He is able to brief in detail on this method statement before the works commence. 1. Chainman 3 2. Surveyor 1 3. Chip Spreader Operator 1 4. Rubber Roller Operator 2 5. Mechanical Sweeper Operator 1 6. Dump Truck Driver 4 7. Bitumen Distributor Operator 1 8. Transport Light Truck Driver 1 9. Pick-up Driver 1 10. Fl

文档评论(0)

1亿VIP精品文档

相关文档