Double Surface dressing 双表处施工英文版
UPGRADING PERAMIHO JCT TO MBINGA ROAD TO BITUMEN STANDARD
Method Statement for Double Surface Dressing
Personnel:
Team leader 1 (Wang Shizheng)
Mr. Zhang will be responsible for the works and all instruction issued on site could be directed to him. He has a good command of English. He is able to brief in detail on this method statement before the works commence.
1. Chainman 3
2. Surveyor 1
3. Chip Spreader Operator 1
4. Rubber Roller Operator 2
5. Mechanical Sweeper Operator 1
6. Dump Truck Driver 4
7. Bitumen Distributor Operator 1
8. Transport Light Truck Driver 1
9. Pick-up Driver 1
10. Fl
您可能关注的文档
最近下载
- 2026年朔州职业技术学院高职单招职业适应性测试备考试题及答案解析.docx VIP
- 桥梁拆除施工方案.docx VIP
- 2023年病案信息技术中级职称(代码:389)考试历年高频考点试题2答案解析.docx VIP
- 九年级中考语文复习【文言实词词义推断六法】课件.pptx VIP
- 2023年病案信息技术中级职称(代码:389)考试历年高频考点试卷+答案解析.docx VIP
- 最详细的MPU6050寄存器说明手册-中文.pdf VIP
- 2025年朔州职业技术学院单招职业适应性测试模拟试题及答案解析.docx VIP
- NB 47013.2-2015-T 承压设备无损检测 第2 部分射线检测.pdf VIP
- 中国电信数据机房设计规范.docx
- 阴道擦洗技术操作规范.docx VIP
原创力文档

文档评论(0)