3503-J407管道系统泄漏性、真空试验条件确认与试验记录

SH/T 3503-J407 管道系统泄漏性/真空 试验条件确认与试验记录 Record of Piping System Leakage/Vacuum Test and Test Condition Confirmation 工程名称Project: 单元名称Unit: Description System No. Inspection items and requirements Result Pipeline pressure test is acceptable. The temporary flanges, bolts and gaskets used for pressure test have been replaced. The safety attachments and instruments not involved in pressure test have been reinstalled. Valves in testing piping system have all been opened. Scale, accuracy and calibration state of test use pressure gauge shall be in compliance with specification. Test