- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Airplane Construction Simulation
Airplane Construction Simulation
Materials:
200 sheets of paper recycled paper is OK if one side is blank
10 sheets of colored paper/marked paper – used to measure lead time in factory
2 fine tip felt markers – same or different colors
4 rulers – 6 inches in length and 1 ruler – 12 inches in length that is 3 cm wide
2 stopwatches
flip chart pad and markers
Room set up:
Tables and chair arranged in small groups of 3 to 5. The training can also be done at a large
table that will accommodate the entire group. Easel stand with paper or a dry board that can
be seen by all.
Goals of simulation/Objectives
Introduce and clarify the difference between Traditional Manufacturing concepts and Lean Manufacturing concepts. For example:
type of waste, non value adding steps
balance work flow
pull system
workplace metrics such as lead time, quality FTT first time through , productivity PPH part built/person/hour , work in process WIP , profit and loss.
Defect prevention
Takt time, Lead time and Cycle time
Simulation Activity Introduction:
You are going to get a chance to run a business. You are coming in on the ground floor. There is a large demand for the produce you will be manufacturing and your design is very innovative. This is your chance to make some really big bucks. You have assembled a great team of workers who are equally invested in this new company.
Product: Airplanes – paper airplane to be specific Manufacturing Process Steps:
Store room: Operator issues raw material to manufacturing in defined lot size. The operator places a paper clip on the stack of paper, one for each sheet. five sheet of paper has five paper clips attached to the edge
Main body department: Operator 1 removes the paper clips and makes two marks in the center of the paper long wise so the second operator can fold the sheet exactly in half. Operator 2 makes the first fold for plane body fold paper in half long wise using the marks . Places a paper clip over the folded sheet to secure t
文档评论(0)