Comparison to conventional hydro
Comparison to conventional hydro
A low-head hydro project generally describes an installation with a fall of water less than 5 metres (16 ft). Most current hydroelectric projects require a large hydraulic head to power turbines to generate electricity. The hydraulic head either occurs naturally, such as a waterfall, or is created by constructing a dam in a river bed, creating a reservoir. Using a controlled release of water from the reservoir creates the head required to turn the turbines. The costs and environmental impacts of constructing a dam make traditional hydroelectric projects difficult to construct.
Damless hydro capture the kinetic energy of rivers, channels, spillways, irrigation systems, tides and oceans without the use of dams
Construction of a dam and reservoir has many environmental effects. For example, the damming of a river locks the movement both of fish upstream to spawn and of silt downstream to fertilize fields . In addition, he vegetation overwhelmed by the rising water decays to form methane a far worse greenhouse gas than carbon dioxide
Since no dam is required, low-head hydro may dramatically reduce the following:
The safety risks (of having a dam), avoiding the risk of a flash flood caused by a breached dam
Environmental and ecological complications
Need for fish ladders
Silt accumulation in basin
Regulatory issues
The initial cost of dam engineering and construction
Maintenance
Removing silt accumulation.
However, low-head units are necessarily much smaller in capacity that conventional large hydro tubines; many more must be built for a given annual energy production – some of the costs of small turbine/generator units is offset by lower civil construction cost. Just as for large hydro, not every site can be economically and ecologically developed; sites may be too far from customers to be worth installation of a transmission line, or may lie in areas particularly senstive for wildlife.
Hydrokinetic turbines
A “Hydrokinetic” turbine