网站大量收购独家精品文档,联系QQ:2885784924

PDOC-476-CTRU-06 Rotating equipment installation procedure.doc

PDOC-476-CTRU-06 Rotating equipment installation procedure.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PDOC-476-CTRU-06 Rotating equipment installation procedure

Client PETRODAR OPERATING COMPANY LIMITED PMC: Contractor CHINA PETROLEUM ENGINEERING CONSTRUCTION CORPORATION DOCUMENT No.: PDOC/476-CTRU-06 CONTRACT No: PDOC/23/06-476 GUMRY Field Production Facilities Project ROTATING EQUIPMENT INSTALLATION PROCEDURE REVISION RECORD Rev. NO. Submission Date Revision Details Prepared By Approved By OWNER A 2007-9-23 Submitted for reviewed Li Yonggang CONTENTS Scope Reference Documents General Rotating equipment installation Pumps Packaged Compressors Installation of Crane Quality record and review reports Revision note 1.0 Scope To define and establish procedures for on site handling, movement and installation of mechanically rotating equipment. Reference Documents Approved for Construction Engineering Drawings Piping Instrument Drawings PID Piping Arrangement Drawings Isometric Drawings Piping Support Pilling Layout Drawings API Std 610 Seventh Edition, February 1989-Centrifugal Pumps for General Refinery Services API Std 674 Maximum Allowable Speed Rating for Power Pumps in Continuous Services API RP 521 Guide for Pressure Relieving and Depressuring System Project Standards, Codes Specifications PDOC-SP-MEC-039 Specification for Multiphase Pumps PDOC-SP-PIP-002 Specification for Piping Design and Layout PDOC-SP-CIV-011 Specification for Piling Installation Project Quality Plan Vendor Installation Manuals Materials Handling Procedure 3.0 General 3.1 Foundations shall be completed and checked for correctness and levelness as per drawings and specifications. Prior to installation, foundation shall be clean with correct anchor boltholes location, centerlines marked, elevations and levels established for correctness. Shimming and wedging shall be carried out as per drawings and specifications. 3.2 As required, perform on-site installation of the various equipments as per approved construction drawings and specifications, and instruction by a manufacturer/vendor representative. 3.3 Final insulation jacketing

文档评论(0)

cj80011 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档