- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
PQ_Form_Template性能确认模版
性能确认(PQ)表格
Name of Facility:_______________________________________________ page _ of _
Validation Protocol # _________ Performance Qualification
Title
Protocol written by
Departmental Approval by Date ________________
QA Approval by Date ________________
Objective
To determine that the systems/equipment perform as intended by repeatedly running the system on
its intended schedules and recording all relevant information and data. Results must demonstrate
that performance consistently meets pre-determined specifications under normal conditions, and
where appropriate for worst case situations.
Scope
1-To be performed after the Installation and Operational Qualification have been completed and approved.
2-To be performed after installation, modification or relocation and for re-validation at appropriate intervals.
3-Each piece of equipment must be validated before it serves another piece of equipment/system during validation of the latter (e.g. water system before steam generator; steam generator before autoclave).
Validation Protocol________________________ Performance Qualification ___page ___ of ___
Title ___________________________ Name of Facility _________________________________
Responsibility
1-Person responsible for operating the system or equipment will perform the qualification and record the information.
2-The supervisor will supervise the study, verify the completion of the records and write the Deviation Report and the Performance Qualification Report.
3-Quality Assurance will review and approve the Performance Qualification Protocol and Report.
Materials, Equipment, Documents
SOPs for normal operations of the equipment or system under test (including data record forms,
charts, diagrams materials and equipment needed). Attach copies.
SOP list: _______________________________________________________________________
_______________________________________________________________________________
___
您可能关注的文档
最近下载
- 河南省信阳市2024-2025学年普通高中高三第二次教学质量检测英语试卷含答案.pdf VIP
- 解读《GB_T 23850-2024工业高氯酸钠》全面解读.docx VIP
- 总经理股东会汇报.docx
- 2025-2030中国二甲基氨基丙胺(DMAPA)行业市场现状供需分析及投资评估规划分析研究报告.docx
- 上海市浦东新区立信会计金融学院附属高行中学2025-2026学年高三上学期9月教学质量检测数学试题+答案.docx VIP
- 点石斋画报.12集.24册.申报馆编印.1884-1889年.pdf VIP
- 印学话西泠 教学课件.pptx VIP
- 慢性呼吸疾病肺康复护理专家共识.pptx
- 七年级数学上册动点问题练习.docx VIP
- GB50666-2011 混凝土结构工程施工规范.docx
原创力文档


文档评论(0)