FRP overlay procedures File Number:MC-09-5 Version: A3 Review: Date: JIANGSU JIAOYAN MARINE EQUIPMENT CO., LTD. JIANGYIN XINJIANG FRP CO., LTD. FRP overlay procedures I. Description The procedures for FRP hand lay-up as to the environmental conditions as stipulated in principle and the necessary instructions. Ⅱ. Environmental condition operation requirements 1. Ply the preparation and examination before the operation 1 Whether the location and external operations for the operator bracket construction is solid and reliable, is clean. 2 The operator tools and equipment should be complete,