Logo Logo Packing Dept Name 2013/7/27 Material CFM Preparation Contents Accoring to production plan and C/S Teams packing instruction, prepare/get all necessary packing material from Material Team. Insole Packing box Other accessories Insole - All insole logos will be heat transferred in sub-factory; - Follow up the cutting and sub-factory production progress, usually everything should be ready 10 days in advance; - 50% of 4 bags/order will be randam checked when receive finished insoles from sub-factory. Insole CFM Preparation Insole top cover material laminated EVA/arch Heat tran