销售部全程操作程图.docVIP

  • 0
  • 0
  • 约7.57千字
  • 约 10页
  • 2016-10-06 发布于贵州
  • 举报
销售部全程操作程图

销售工作流程图 接待客户流程图 签认购书流程图 签买卖合同流程 交楼发信流程图 现楼发信流程图 现场交楼流程图 办理产权流程图 延迟签约流程图 换房流程图 销售部业务流程 P10/10 of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good quality of purchasing instrument and ovality of the guarantee instrument tubes as small as possible, selection of high quality, high precision sleeve connector. Instrument pipe welding, construction workers and technicians on every road, every instrument as well recorded and well identified in the instrument, welding wel

文档评论(0)

1亿VIP精品文档

相关文档