项目组活动策划周奕.docVIP

  • 1
  • 0
  • 约 16页
  • 2016-10-06 发布于贵州
  • 举报
项目组活动策划周奕

2014浙江工商大学学助中心 “百元创收”体验活动 策 划 书 浙江工商大学 学生处 学生助学服务中心 二〇一四年二月 目 录 一、活动简介 2 (一)活动背景 2 (二)活动主题 2 (三)活动目的 2 (四)活动时间 3 (五)活动地点 3 (六)活动对象 3 (七)主办单位 3 二、合作分工 3 (一)宣传组 3 (二)企业联系组 4 (三)活动组 4 三、活动流程 5 (一) 活动前期 5 1、宣传工作 5 2、物资准备 6 (二) 活动中期 6 (三) 活动后期 7 1、参赛获奖情况公布; 7 2、后期场地打扫; 7 3、后期工作总结; 7 4、相关财务报销。 7 附录: 8 附录一:宣传方案细解 8 附录二:报名渠道: 9 附录三:活动预算 10 附录四:工作手册 11 附录五:注意事项 13 附录六:报名表 14 附录七:收集处理表 15 一、活动简介 (一)活动背景 在中共中央召开两会后,为贯彻落实培养在校大学生自立自强,为将来就业打下坚实的基础,提高在校学生创意思维和竞争意识,浙江工商大学学生处学生助学服务中心在浙江工商大学学生处老师的指导下开办第一届“百元创收”活动。希望借此契机浙江工商在校大学生报名 报名者 2014浙商大学助中心“百元创收”体验活动 of support and hanger. Cable hole plugging gaps should use qualified fireproof materials, block surface should have sufficient strength, surface appearance. When cables pass through the firewall, of lax structure of local fire safety clamps. Thermoplastics production, to comply with the process, no bubbles in the thermoplastics pipes, linear nose consistent with the core wire specifications, contact is good, no cracks, break. Tinned copper nose clean solder full exterior surface is smooth without burrs. Control cable Assembly should be fastened, dense, solid, clean, and beautiful. Secondary wiring the cable terminations should be arranged by the actual location of the device line cards, the wiring from the upper to the lower, from left to right in the order. Fixed to maintain consistent spacing between lines, flat, should be around the corner in the same location, same shape, to ensure that the wiring process neater and more elegant. 5 thermal process control measures for quality problems 5.1 control thermal duct system leakage measure to ensure that the use of electric door and actuator installation quality and equipment to the site to check its seal, acceptance, in order to fundamentally solve oil spill problems. Plant for local Panel after installation, in conjunction with the quality Department to check its overall quality, poor-quality parts replacement. Supply good

文档评论(0)

1亿VIP精品文档

相关文档