工法样板1:沥玛碲脂碎石混合料(SMA)路面面层施工工法(YJGF 38-2004

center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn 0.05mm feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually 0.15~0.25mm. In the case of coupling connection, if possible, lifting only one bearing en