- 12
- 0
- 约5.59千字
- 约 28页
- 2017-03-06 发布于浙江
- 举报
110kV变电设计图纸
construction work area in the form of conference reviews. 2 review program review date is determined by the project manager; According to the project manager of project quality control Department requires preparation of a management plan, representative of the management audit of the project, approved by the project manager; Review Project Office issued notices of meetings; Project manager facilitates the review meeting, scheduled content under review; Quality control Department is responsible for the records, the preparation of the review report and corrective action plan, representative of the management audit of the project, approved by the project manager; Quality control Department is responsible for the preparation of records and reports the distribution list, or publish to the Internet by engineering part of the project staff and departments. Organized by the quality control Department is responsible for tracking the implementation of corrective measures inspections. 3.4.5 the output from the management review shall include the following elements: the effectiveness and suitability of the quality management system, whether it be maintained and revised; Quality policy and quality objectives are achieved and to meet customer requirements, whether it be maintained and revised; The allocation of resources to meet requirements, whether you need to add or adjust. 3.4.6 corrective action tracking and verification on the issues raised in the review, by the primary responsibility of departments draw up corresponding specific corrective, preventive and corrective measures, and seriously implemented. Project quality control Department is responsible for the tracking, verification and evaluation the effect of corrective and preventive actions. 3.4. ... 1 the safety programs and departments dealing with the formation of urban spatial
construction work area in the form of conference reviews. 2 review program review date is determined by the project manager; According
您可能关注的文档
- 10701回风掘进作业规程 2.doc
- 10802掘进作面探放水设计.doc
- 10903掘进作面作业规程.doc
- 109759_价常识200条.doc
- 10写字楼设计务书.doc
- 10化本仪器分实验内容.doc
- 10合同段施工场临时用电管理方案.doc
- 10吨内燃平衡叉车自动变速控制系统软件设计说明.doc
- 10年外贸单证考试真题操作部分及答案 2.doc
- 10年度安全工总结.doc
- 2025-2026学年天津市和平区高三(上)期末数学试卷(含解析).pdf
- 2025-2026学年云南省楚雄州高三(上)期末数学试卷(含答案).pdf
- 2025-2026学年甘肃省天水市张家川实验中学高三(上)期末数学试卷(含答案).docx
- 2025-2026学年福建省厦门市松柏中学高二(上)期末数学试卷(含答案).docx
- 2025-2026学年广西钦州市高一(上)期末物理试卷(含答案).docx
- 2025-2026学年河北省邯郸市临漳县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省石家庄二十三中七年级(上)期末历史试卷(含答案).docx
- 2025-2026学年海南省五指山市九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省唐山市玉田县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省邢台市市区九年级(上)期末化学试卷(含答案).docx
最近下载
- 产后骨盆修复全流程指导手册.docx VIP
- HG∕T 2568-2021 工业偏硅酸钠.pdf
- 2025年鄂尔多斯市特岗教师招聘考试真题汇编附答案解析.docx VIP
- 24小时客服电话:010-82311666免费咨询热线:4.doc VIP
- 2020ACLS学员课课前测试中文版试题+答案.pdf VIP
- 髌骨脱位康复护理新进展.pptx VIP
- 急救医学-第四章心悸.ppt VIP
- 高中数学必修第四册第十一章综合测试01含答案解析.pdf VIP
- 2022年高考物理核心高频考点专题22 圆周运动的轻绳、轻杆模型(解析版).pdf VIP
- 马工程-中国古代文学史(第二版)上册第三编魏晋文学全套PPT课件50109.pptx
原创力文档

文档评论(0)