- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
成套设备出口合范本及说明
?? Contract for Exporting Mining Equipment
?
Contract No. ____
?
?
This Contract is made and entered into on the 15th,Oct. in Sulaiminiyh by and between Mass Iraq Cement Co,Ltd ( as the Buyer) and China Jiangsu Grand Economic Devolpment Co.,Ltd. a company incorporated under the laws of China(hereinafter referred to as the seller).
?
Whereas, the Buyer desires to engage the Seller to provide the Mining Equipment, all related design, technical document, technical service and technical training and to obtain from the Seller a license of know-how and other technical information in relation with the Equipment’s design, erection, commissioning, operation and maintenance. Now it is hereby mutually agreed as follows:
?
Article 1 Definitions
?
1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article xx.
?
1.2 “Commissioning” means the operation of the Equipment in accordance with Article 9.4 for the purpose of carrying out Performance Test.
?
1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.
?
1.4 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 16.1.
?
1.5 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.
?
1.6 “Erection” means the installation of the Equipment including placing and connecting parts to their positions according to the design drawing.
?
1.7 “Job Site” means the site where the Equipment shall be located and/or erected, namely Mass Iraq Cement Plant.
?
1.8 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached 100 percent of the total the Equipment price.
?
1.9 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures .
?
1.10 “Technica
您可能关注的文档
- 微店网供应商进后操作指导.docx
- 微观经济学标准案1126.doc
- 德兴市妇幼保健组织设计.doc
- 微软中国携手助 学员使用手册.doc
- 德国汉莎航空公是世界十大航空公司之一.doc
- 德国汉莎航空公外汇的套期保值教训.doc
- 德明外国语学校015月考质量分析报告.doc
- 德赛电池视频监系统管理规定.doc
- 心平自立贷学金施细则.doc
- 心理健康辅导员证考试按大写字母排序.doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)