- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电影《魂断蓝桥审美评价
看《魂断蓝桥》画面语言审美特征
《魂断蓝桥》英文名叫做《waterloo bridge》,翻译成中文名是引用了一个典故,而这个典故,恰恰与电影的主题完美的结合在一起。
《史记·苏秦列传》记载:公元前320年,苏秦向燕王讲过一个“尾生抱柱”的故事。相传有一个叫尾生的人,与一个美丽的姑娘相约于桥下会面。但姑娘没来,尾生为了不失约,水涨桥面抱柱而死于桥下。这座桥在陕西蓝田县的兰峪水上,称为“蓝桥”。从此之后,人们把相爱的男女一方失约,而另一方殉情叫做“魂断蓝桥”。
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensive understanding of drawing; 3) finding of design-driven dimensions (), do not resize and adjust the size; 4) questioned the drawings; 5) develop buries a construction programme and technical clarification; 6) clear corners and special treatment; 7) controlled construction drawings to verify construction scheme and design. (2) at the construction site to find subject planted area: various engineering, first on the scene to find planted area, it must first understand the curtain wall installation section, and some projects are all curtain wall, the entire project is a region-wide, only partial walls, the zone is local. (3) identify the axis positioning: positioning the drawings shown in axis compared with the actual construction site to find out exactly where the axis positioning, axis positioning function are: 1) to help determine the origin of curtain walls; 2) acceptance of the installation is accurate; 3) adjust errors, and determine the error range. (4) find anchor points: according to site to find the exact location of the axis, according to the drawings provided by the content determine the positioning point; number of anchor points shall not be less than two points. Repeated measurements determine the location points must ensure that the positioning is correct. (5) take level (level): level (minor works available in horizontal pipe), the two anchor points determine the horizontal position. Level according to use
the drawings, first to become familiar with the drawings, mainly about the following aspects: 1) pages of drawings and diagrams, maps; 2) a comprehensiv
您可能关注的文档
- 生物必修1至3习提纲.doc
- 生物必修一第二元 第8课时.doc
- 生物必修二1-章检测题.doc
- 生物必修二1、章 课后习题及答案.doc
- 生物必修二第一预学案.doc
- 生物校本课程:用菌栽培技术.doc
- 生物植物有丝分等记忆的口诀.doc
- 生物研究的确需很多不很smart的劳动力.doc
- 生物竞赛:初中赛:2012年初中复赛卷及参考答案.doc
- 生物第六第七第章知识点整理 精简版(免费).doc
- 中国行业标准 GM/T 0126-2023HTML密码应用置标语法.pdf
- 《JJF 2121-2024恒转速源校准规范》.pdf
- 餐饮服务中20条处理要点.docx
- 《GM/T 0011-2023可信计算 可信密码支撑平台功能与接口规范》.pdf
- 《JJF 2134-2024旋转流变仪校准规范》.pdf
- JJF 2121-2024恒转速源校准规范.pdf
- 计量规程规范 JJF 2121-2024恒转速源校准规范.pdf
- 《JJF 2118-2024压力式六氟化硫气体密度控制器校验仪校准规范》.pdf
- JJF 2134-2024旋转流变仪校准规范.pdf
- 计量规程规范 JJF 2134-2024旋转流变仪校准规范.pdf
文档评论(0)