National Cranberry Cooperative (NCC) Case Study Report.docxVIP

National Cranberry Cooperative (NCC) Case Study Report.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
National Cranberry Cooperative (NCC) Case Study Report

L6116 team members: Jia Hao, Abhishek Karmakar, Zhichao Peng, Devang Shah, Jun Xie National Cranberry Cooperative Case Study On February 14, 1971, Hugo Schaeffer, the vice president of operations at National Cranberry Cooperative (NCC) is reviewing the previous year’s process of fruit operations at receiving plant 1 (RP1). He states that they still have high overtime costs, despite spending $75,000 on a new dumper. Trucks are still having to wait to unload fruit at the receiving plant. This report will analyze the current state of RP1, analyze Walliston’s recommendations, and provide justification for implanting the recommendations. In appendix A, a process flow chart is included to describe the process both dry and wet berries go from receiving to shipping. A few assumptions were to be made before beginning to solve the problem. The assumptions that were made for this problem are: An average of 18,000 bbls of berries received on the peak day. On the peak day, working hours were capped at 12 hours. 58% of the berries received on the peak day were wet berries. A constant rate of 200 bbls/hour for each machine in the drying process. A constant rate of 400 bbls/hour for each machine in the separation process. Using these assumptions, calculations were made for the capacity of the bins and each process. These values were used to determine the bottleneck of the process, since the bottleneck will give us an indication of which process is the slowest and causing the delays for the trucks. Total number of wet berries received/day: 18,000 bbls * 0.58 = 10,440 bbls/day. Total number of wet berries received/hour: 10,440 bbls / 12 = 870 bbls/hour. Mixed berry bin capacity: Bins 17-24, total of 8 bins * 250 bbls/bin = 2,000 bbls/bin. Wet berry bin capacity: Bins 25-27, total of 3 bins * 400 bbls/bin = 1,200 bbls/bin. Total capacity for wet berries/day: 2,000 + 1,200 = 3,200 bbls/day. Dechaffing process rate: 1,500 bbls/hour * 3 machines = 4,500 bbls/hour. Drying process rate: 2

文档评论(0)

me54545 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档