英语听力,商业讲之得奖感谢.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英语听力,商业讲之得奖感谢

英语听力,商业演讲之得奖感谢 Ladies and gentlemen, Mr. President, and all the distinguished guests. I cannot believe that I have been selected as this years recipient of the Award for Outstanding Performance. When I was informed of the announcement of my nomination, I couldnt believe my ears. In fact, I am still not sure if I really deserve this honor, because I know many of my colleagues who work harder even with a greater dedication than I do. I believe they also deserve this award, and I think I happen to represent them in accepting this award. Through thick and thin, they have always been my precious team mates, adviser, and above all, friends. I want to take this opportunity to thank them all, and want to share with them the pleasure and honor of receiving this award. Thank you very much, and Ill be trying my best to contribute to further growth of our company. 如果是正式的得奖感言,以 Ladies and gentlemen 来做开场白为宜。若属气氛随和的聚会,就要因场面不同而选不同的说法,这点请注意。 Notes: through thick and thin:同甘共苦中过来的 deserve this award: 堪当此奖 登陆网站 参加免费试学 enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick enclosure should be installed where the level of the final ground elevation as standard, specific requirements are: heat, electrical control cabinet fixed type switch cabinet enclosure base with ground elevation difference6.2.5 all enclosure after leveling, both ends of wire rope inspection, requires all sides in the same line. 6.2.6 DCS when installing the enclosure and the enclosure base load plant or self-made 10MM thick enclosure should be installed where the level of the final ground elevation as standard, specific requ

文档评论(0)

hhax1 + 关注
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档