- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三菱PLC-FX 32MT的plc四层电梯控制系统设计-论文
三菱PLC-FX2 32MT的plc四层电梯控制系统设计
Abstract
PLC is a specialized in industrial environments for applications designed
to operate electronic digital computing device. It uses the memory can
be programmed to store in its internal implementation logic operations,
the order of operations, timing, counting and arithmetic operations, such
as operating instructions, and can be digital or analog input and output,
control of various types of machinery or the production process. PLC and
its associated peripheral equipment should be in accordance with the
industrial control system is easy to form a whole, easy to extend the
principle of its design features. In this article I explained the concept
of some of the specific PLC, in the elevator control design steps, as well
as on the elevator with PLC hardware protection method. In the design of
the elevator, I elaborate on the use of PLC control hardware and software
design process, a list of specific hardware circuits, and analyzes the
major role of input and output points. In the PLC of the elevator control
system, elevator, through the use of control software functions are
achieved, in order to control the operation of software and Elevator
Action has a good relationship between the elevator control software
program, I display the main floor is divided into procedures, call sign [錧N鶴Hry2
procedures, upper and lower lines, switches, door procedures, carry out
their duties, the operation of the elevator control.
Elevator control can be divided into the following three periods:
1. By mechanical relays (Relay) to control, but the circuit complex and
prone to failure.
2. To digital integrated circuits (Digital IC) to complete control of its
timing.
3. In recent years the rapid development of the programmable logic
controller (PLC) to control not only can solve the shortcomings of the
relay control, but also improved the integrated circuit digital logic
design cumbersome, but also reduce costs. In this
您可能关注的文档
- 三年级数学下册全教学设计.doc
- 三年级数学下册单教学计划.doc
- 三年级数学下册三数除以一位数除法笔算.doc
- 三年级数学下册总习第7课时 对称.doc
- 三年级数学下册教(da).doc
- 三年级数学下册《方形和正方形的面积计算》教学设计.2.doc
- 三年级数学下册教计划及第一单元备课.doc
- 三年级数学下册教重难点及教学点滴.doc
- 三年级数学下册整与复习(一)教案 2.doc
- 三年级数学下册教计划、进度计划.doc
- 专卖店促销员销售与成交技巧培训课件(34P).pptx
- 红色商务风新员工入职销售技巧知识培训课件(34P).pptx
- 专卖店商场销售员销售与成交技巧培训课件(34P).pptx
- 小区物业保安法律知识培训课件(28P).pptx
- 专卖店销售员轻松成交技巧培训(34P).pptx
- 轻松成交客户新员工入职通用销售技巧知识培训(34P).pptx
- 2024年初级《银行业法律法规与综合能力》考前必刷必练题库500题(含真题、必会题).docx
- 2024年“新安法知多少”知识竞赛题库及答案(最新版).docx
- 2024年30秒毕业生面试工作自我介绍.docx
- 2024年《医务人员礼仪培训》心得体会.docx
文档评论(0)