学位论文-—4万吨污水处理厂氧化沟工艺设计说明书.docVIP

  • 0
  • 0
  • 约 76页
  • 2016-11-24 发布于辽宁
  • 举报

学位论文-—4万吨污水处理厂氧化沟工艺设计说明书.doc

学位论文-—4万吨污水处理厂氧化沟工艺设计说明书.doc

摘要 污水处理厂设计规模近期40000 m3/d,远期60000m3/d,故本设计按近期设计,远期规划。污水厂二级处理出水排至河流下游。 污水处理厂处理流程为:污水→中格栅→提升泵房→细格栅→钟式沉砂池→氧化沟→二沉池→紫外消毒→出水。 污泥流程:剩余活性污泥→污泥提升泵房→浓缩脱水一化车间 →污泥外运。 本污水处理厂占地约为7.2公顷。 关键词:污水管网 雨水管网 氧化沟 浓缩脱水一体化设备 Process design of 40000t/d city sewage treatment plant Astract With the develop of our country society economy continuously, Vitalization is gradually increasing, Environmental protection measure of practical, and with establishing of the Market economy, Draining, As one of the important foundation facilities, also got a fast development. The city in the whole nation almost reform drainpipe