静止式进相器可行性项目分析报告.docVIP

  • 6
  • 0
  • 约3.03万字
  • 约 28页
  • 2016-11-26 发布于贵州
  • 举报

 静止式进相器可行性项目分析报告.doc

 静止式进相器可行性项目分析报告

静止式进相器可行性项目分析报告 Feasibility analysis of stationary phase advancer 一、项目的意义和必要性 随着电能的广泛应用,电力的质量却成为日趋严重的问题。尤其大型电机大规模使用,带来的功率因数下降已成为电力系统的主要问题。据估算功率因数的下降每年给全国电网造成的能耗损失,相当于四座三峡大坝。这些给全社会造成直接的损失非常大。 1. The significance and necessity of the project With the extensive application of electricity, power quality has become an increasingly serious problem. In particular, large-scale using of large power motors which bring the power factor drop have become the main problem of the electricity system. According to estimates the power factor of the energy loss per year to the national grid drop caused by th

文档评论(0)

1亿VIP精品文档

相关文档