- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Hoist the etal structure and all electrical equipment metal case
Hoist the metal structure and all electrical equipment metal case, they can the grounding resistance should be less than 10 Ω.
5) portable control unit should be sealed, insulation, control circuit voltage should be not more than 36 v, the lead length shall not be more than 5 m.
6) work lighting switch, should with the main power switch are independent of each other. When improve mechanical and electrical source is cut off, lighting power should not work. The respective switch should be clearly marked.
7) to ban the use of a reversing switch as a hoist control switch.
9.8.2.5.4 elevator safety protection device
1) dock safety device: hanging basket when running in place, docking device position hanging basket. The device should be able to bear the weight of hanging basket and reliably rated load and material handling personnel and loading and unloading of the work load of material.
2) broken rope protection device: when the hanging basket or in the operation of the rope, it is should be able to reliably stop and fixed on the frame body. When the slide stroke, hanging basket full load, shall not exceed 1 m.
3) on the limit stop (anti collision device) : the device should be installed in the hanging basket the highest working position allows for ascension. Hanging basket of the process (from the top of the basket and day beam minimum distance), shall be not less than 3 m. When hanging basket rise to limit height, stop the action, to cut off the power supply (refers to a reversible hoist) or automatic alarm (point to) of friction hoist.
4) floor of mouth dock door: channel of the floors, should set the dock door of normally closed, appropriate USES interlocking device (hanging basket when run in place before open). Dock door can be used steel pipe manufacturing, its strength should be able to withstand the horizontal load of 1 kn/m.
5) before and after the hanging basket exit: feeding mouth hanging basket should furnish exit. Door open appropriate USES interlocking dev
您可能关注的文档
最近下载
- 高职入学考试英语复习指导丛书—语法专项训练教学课件(第四章数词).pptx VIP
- 2025年秋统编版语文三年级上册全册教学课件(课标版).pptx
- 2025年最新人教版小学二年级数学上册教学计划及进度表(新课标,新教材).docx
- 小区监控系统设计方案.pptx VIP
- 丹方模拟器1.32(新增龙宫草药)(1).xlsx VIP
- 等一朵花开读书分享PPT.pptx VIP
- 2012国际严重脓毒症和脓毒症休克治疗指南(SSC)..doc VIP
- 【免费】小学一年级数学“凑十法”练习题100道 .pdf VIP
- 幼儿园装修工程实施方案(模板范文).docx
- 高中物理必修二学历案.docx VIP
文档评论(0)