- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
目录
1、编制目的及适用范围··································································2
2、编制依据·············································································2
3、停工工程概况·······································································2
4、停工部署············································································3
4.1、停工安排···········································································3
4.2、停工期间主要工作内容·······························································3
5、停工具体工作安排及做法·······························································3
5.1、现场清理·········································································3
5.2、成品保护·········································································4
(1)、钢筋··············································································4
(2)、地库区域的降水····································································4
(3)、后浇带部位保护···································································6
(4)、F区、G区原土保护··································································10
5.3、主要材料机械设备退场······························································10
(1)、周转材料·········································································10
(2)、钢筋加工设备及木工设备···························································11
5.4、人员退场··········································································11
6、施工组织设计········································································11
7、项目正常运转保障措施································································11
7.1、人员组织保障····································································11
7.2、进度质量保障····································································12
7.3、安全文明施工保障·································································12
1.编制目的及适用范围
根据2015年10月19日甲方下发的指令单编号-003,具体内容为:请贵司暂停苏州绿地中央广场3#地块3#楼办公楼的施工,具体复工日期待我司复工指令单为准。我司在收到指令单—003后根据图纸及现场时间情况分析以联系单编号-022回复,地库范围包括3#楼地下室一层、二层,3#楼暂停施工直接影响未完成地库F区、G区施工(F区、G区是3#楼出土唯一运输路线)同时也将影响地库的
您可能关注的文档
最近下载
- 2024年第十六届全国大学生数学竞赛初赛试卷及参考答案(非数学B类).pdf VIP
- 自考本科《小学综合性学习与跨学科教学》2025年4月模拟题附答案.docx VIP
- 高校教师培训教学设计模板.docx VIP
- 《野外辨别方向》课件.ppt VIP
- 2024年第十六届全国大学生数学竞赛初赛试卷及参考答案(非数学A类).pdf VIP
- 医务人员职业防护.ppt VIP
- 第42届全国中学生物理竞赛复赛试题.docx VIP
- 万科示范区验收移交指引.docx VIP
- 唐代僧人的法律规范-政大机构典藏.PDF
- 2025-2026学年高二地理上学期第一次月考卷5【测试范围:选择性必修一,第1~2章第1节】(原卷及解析).docx VIP
文档评论(0)