- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
for defectve parts must be new surface treatment should be carried out
for defective parts must be new surface treatment should be carried out.
5. The equipment and pipeline corrosion protection for buried structure construction, using epoxy coal asphalt material, should be after the primer table dry, curing should be applied before the first finish, and should be on the premise of not flowing will paint layer thicker, 1/8-inch-thick and winding glass cloth immediately. After the glass cloth round should immediately apply the paint. Before a final paint should be in a paint coating after work. Polyethylene tape coating construction shall be provided in accordance with the manufacturer of the primer specifications paint primer. After primer table dry adhesive tape winding, should prevent during surface contamination. Adhesive tape volume of solution temperature should meet the specified temperature adhesive tape manufacturers, under the low temperature solution volume will cause the damage of adhesive tape.
Factory-made anticorrosion of buried pipeline in a single layer, such as epoxy powder anticorrosive layer, three layer PE anticorrosive coating, welding section should be 150 mm and subtract 10 mm reserved. Stay after assembly welding repairing, repairing materials should be compatible with the original coating material, and repairing quality shall not be lower than the original coating quality. Trench backfill should be done before coating quality inspection, the defective position should be patching.
6. After the anti-corrosion engineering, when hoisting and transportation equipment, pipe, pipe fittings, avoid collision and damage, before use should be properly kept.
(3) the anticorrosion engineering construction quality inspection requirements
Construction process quality inspection is the key of the anticorrosion engineering inspection, at the same time corresponding in strict accordance with industry standards and design requirements.
1. In corrosion protection engineering construction process, intermediate inspection must
您可能关注的文档
- ERP-非财务人员的务培训教(五)------资本结构筹划.doc
- ERP沙盘模拟经营实演练方案-kinydee.doc
- ES - SIMATC Manager -- 项目操作 -- 编译,装载OS.doc
- ESSAY和Dissrtation写作常用词汇与表达方式.doc
- essay--huner5.doc
- Essence ofEducation.doc
- EU GMP第六章节量控制- quality control 翻译.doc
- EUROPEAN SVEREIGN DEBT CRSIS.doc
- EVA价值管理在中小业中的应用分析.doc
- Evid BasedComplement Alternat Med.doc
文档评论(0)