In accordace with the requirements of the technical standards and technical regulations work.docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
In accordace with the requirements of the technical standards and technical regulations work
In accordance with the requirements of the technical standards and technical regulations work. Perform technical standards and technical regulations shall, in accordance with the standards and procedures to carry out the technical work. So, in the process of the project, first of all should be familiar with what are the standards and procedures, and should organize relevant personnel to study, and in the process of concrete operation strictly comply with them.
3. Based on technical management system. Technical management system generally includes: the construction drawings will be checked, the construction organization design management system, technical disclosure system, construction materials and equipment inspection system, engineering quality inspection approval system, technology organization measures system, engineering construction technique data management system, etc. The basis of it is to do a good job of technical management.
4. The requirement of scientific experiment. In the project implementation, materials, equipment, process scheme, the determination of some technical parameters and so on, may need to aid decision making by using the method of conducting scientific experiments.
5. Technical training requirements. In a planned way to carry out the technical training of technical personnel and operators, to meet the requirements of project construction technology.
6. four new job requirements. Constant promotion and application of new technology, new process, new material, new equipment, promote construction level enhances unceasingly.
7. Check the guide requirements. Project department director and technical personnel should often deep construction site inspection technology; To guide the construction work, strictly according to the figure construction, implement the technical proposal; To correct the violation operation, stop the violation of the process discipline; Timely processing of construction technical issues.
8. Problems existed in pro
您可能关注的文档
- GMP-F12 IS22716-2007 Audit Checklist.doc
- GMP认证检查结果评程序.doc
- GMV智能多联机组产电气安装.doc
- GNC各产品说明以及用方法.doc
- GNR-supremjack 3.doc
- GnRH-a在妇科的床应用.doc
- GM注射液的一般药理实验研究.doc
- gnuplot的三维图.doc
- gnu组织的所有软件下载地址.doc
- Horngren-fnancial accounting(9e)-solutions-7.doc
- In Isolate Hills of Asia, New Roads to Speed Trade.doc
- Including he metal surface coating layer mainly for all kinds of lining.doc
- INDICATION FOR PEDIATRIC.doc
- Individualsm.doc
- Ineffectivness of Breath Methane Excretion as a Diagnostic Test for Lactose Malabsorption.doc
- IELTS写作分类词记忆.doc
- Infiltratin of culture background knowledge in Co.doc
- Inflammatoy mediators induced by coarse.doc
- Including he key raw materials.doc
- Informatioextraction system design and its commercial use.doc
最近下载
- 中央空调净化系统标准规范操作规程.doc VIP
- 神志病中西医结合临床诊疗指南-精神分裂症.pdf VIP
- 混凝土重力坝施工课件.pptx VIP
- 辽宁省大连市2025届高三上学期双基测试数学试卷含答案.pdf VIP
- 2025-2026学年赣美版(2024)小学美术三年级上册《创意美术字》教学设计.docx
- 2.2 大气受热过程和大气运动(精品课件)-【居易课堂】2021-2022学年高一地理同步备课优质课件(人教2019必修第一册).pptx VIP
- 杜邦dupont芳纶凯夫拉kevlar应用领域.pdf VIP
- 细胞生物学(第五版)-第8章细胞骨架.ppt VIP
- InCAM Pro基础入门篇(中文).pdf VIP
- 2024届辽宁省大连市高三上学期期末双基测试化学试题及答案.pdf VIP
文档评论(0)