unquaified welds should be repair
unqualified welds should be repair, repair should be stipulated in the original after checking. Each weld overhaul shall not be more than 2 times.
4.4 the flange and valve installation
Valve inspection
Valves are used in the heating pipe network engineering, must have a factory product certificate and engineering seat valve inspection department inspection qualified certificate;
Without the project the valve seat valve inspection department, should according to the current national standard pipeline engineering construction and acceptance standard test (GBJ235);
Heating pipe network used in the main valve and directly connected to heating network main valve; Trunk and head end and thermal protection stand at the entrance to the closed and the valve strength and leak test shall be carried out individually, separate storage, positioning, and fill the valve test record.
The valve installation
Proofreading as stipulated in the design model, the valve appearance inspection should be no defect, flexible open and close;
Remove valve mouth closed (or file) and other impurities;
The handwheel should be put in to operation of valve position. Horizontal installation of the valve is in the upper within weeks. The valve should be installed under the closed;
Valve operating mechanism and transmission should be cleaning check and adjustment, flexible, reliable, and no jamming phenomenon, switch indication degree should be accurate;
Cluster installation of the valve should be according to the principle of neat, beautiful, easy to operation for ranking;
The valve handwheel shall not be used as lifting ChengChongDian.
4.5 compensator installed and cold, hot tight tight
The installation of the compensator is:
The arm should be placed in horizontal, vertical, parallel arm should be the same as the pipe slope;
Vertical installation, do not open the hole on the bent pipe installation put duct and drain;
Compensator in the slippery of offset should comply with the provisi
您可能关注的文档
- Unit A land of diversity 单元基础测试卷(A卷)(人教版选修八).doc
- Unit Does your best friend have four legs.doc
- Unit El Nino.doc
- UNit Engineering.doc
- unit English around the world writing 教案.doc
- Unit Feedback.doc
- Unit Face to Face with Hurricane Camille.doc
- unit Good Habits.doc
- Unit Good Manners 测试.doc
- Unit Great scientists(一).doc
最近下载
- 档案整理及数字化投标方案(517页).doc VIP
- 第六章+第三节++黄土高原课件-2023-2024学年商务星球版地理八年级下册.pptx VIP
- 高一上期末数学试卷(含答案).doc VIP
- 2024年11月全国事业单位联考综合应用能力(A类)试题及参考答案.pdf VIP
- 《地理信息系统原理与应用》课程标准.doc VIP
- 商务星球版初中地理八年级下册第六章第三节黄土高原.pptx VIP
- 病句的修改大全修改病句大全及答案.docx VIP
- 1.《地理信息系统技术应用》课程标准.docx VIP
- 最优控制-西安交通大学课件lecture07.ppt VIP
- 最优控制-西安交通大学课件lecture5.ppt VIP
原创力文档

文档评论(0)