- 10
- 0
- 约 14页
- 2016-12-06 发布于湖北
- 举报
TREK测试资料E化学习
TREK实验室测试资料E化学习范柏利2015/04/29GCK Frame Batch Testing ProcedureBatch test frames should be randomly selected to do tests alternately as shown below:1st one: ISO LCF (Horizontal) ISO falling frame2nd one: Stiffness ISO CSF ISO falling massBatch Test LevelTotal Frames ProducedFrames per BatchLevel 1Less than 1000 pcs50 frames per batchLevel 21001-1500 pcs100 frames per batchLevel 3Over 1500 pcs200 frames per batchBatch Test Frame CharacteristicsAll Batch Test frames shall be traceable to the batch they represent, and this identification method shall remain visible after all manufacturing operations. Batch Test frames shall be production-representative in every respect.Batch Test frames shall be tested after being painted test frame white.If all tested frames meet standard, they shall be destroyed prior to disposal.Digital images shall be taken of each destroyed frame showing the serial number and destructive damage to the frame.The serial number shall be linked to the corresponding batch test data.The GCK quality will review the production plan(size and quantity) in coming whole week.pick-up sizes will be decided if the production plan requiresTotal quantity will be weekly order quantity/200 batch, if pick-up number larger than size numbers, the some sizes will be picked up more than 1pc. If pick-up number less than size numbers, the sizes not be picked up from current batch will be picked up from in coming batchThe main rule is still keeping sizes recycled to make sure every size could be showed up.Frequency : 1 / X (X without size division)X = 50 : 1~1000 pcsX = 100 : 1001~1500 pcsX = 200 : 1500 pcsFailure ActionsBatch Testing Level 1 1 frame per batch of XCracks : No more cracking when extension testing(20% Cycles, no dimension extent)Fracture : Obvious damage is visibleResult: Frame fails test (“A” sequence test per slide 1)Action: Notify Trek ME, DE, and QE representatives Failure Mode Analyze (Cracks / Fracture) ?PDCA All frames from that day and adjacent d
您可能关注的文档
最近下载
- 提高市政雨水管道接口施工一次验收合格率.docx VIP
- 食品企业管理体系建立与认证吴亨覃海元61课件.pptx
- 新智能制造产业领域的智能仓储与物流解决方案.pptx VIP
- 电子科技大学860软件工程学科基础综合2020年考研专业课初试大纲.pdf VIP
- 2026人教版小学英语四年级上册期末综合试卷(3套含答案解析 打印版).docx
- 复杂底座的三维造型及数控加工工艺设计.docx VIP
- 2024北京昌平一中高三11月月考英语试题及答案.pdf VIP
- “建筑制图基础实训作业”及“建筑制图与识图实训小作业1-4部分参考答案”.pdf VIP
- 《食品企业管理体系建立与认证》课程标准.docx VIP
- 2025年房地产经纪人养老地产风险管理与应急预案专题试卷及解析.pdf VIP
原创力文档

文档评论(0)