辽宁科技大学本科生毕业设计 第 PAGE 48页
摘 要
本设计主要用于哈大客运专线高速铁路无砟轨道施工范围内的墩台、路基、隧道工程施工过程中的沉降变形观测。本管段要求构筑物应具有足够的强度、刚度、稳定性,满足耐久性要求,并强调与相邻构筑的变形与刚度协调统一,满足高速列车平稳、安全运营,以及旅客乘坐的舒适度要求。针对以上客运专线的特点,无砟轨道对路基、桥涵、隧道等线下工程工后沉降要求十分严格、标准高。虽然设计中对土质路基、桥梁墩台基础等均进行了沉降变形计算,采取了相应的设计措施,但设计的沉降分析、计算受勘测、设计、施工、质量监测等众多环节的影响,其精度仅能达到估算的程度,不足以控制无砟轨道工后沉降和差异沉降。为确保线土建工程满足无砟轨道铺设条件的要求,在施工期间必须按设计要求进行系统的沉降变形动态监测。
关键字:无砟轨道;变形监测;墩台工程变形监测;路基工程变形监测;隧道工程变形监测
ABSTRACT
The design is mainly used for the construction of the pipe within the piers, foundation, tunnel construction in the settlement process of observation. Harbin-Dalian Passenger rail requires no residue structure should have sufficient strength, stiffness, stability, meet the durability requirements, and to emphasize the deformation and the stiffness of the adjacent building harmonization to meet the high-speed train smooth, safe operation, and passengers ride comfort requirements. Passenger view of the above characteristics, no slag track on the roadbed, bridges and culverts, tunnels and other line works very strict settlement after the standard high.Although the design of the soil subgrade, bridge piers, foundation settlement Dengjun were calculated to take the appropriate design measures, but the design of the sedimentation analysis, calculated by the investigation, design, construction, quality monitoring and many other aspects of the impact, the accuracy only to estimate the extent sufficient to control track of the settlement after no residue and differential settlement. Civil works to ensure that cable laying track to meet the conditions of slag-free requirements, the construction requirements of the system must be designed dynamic monitoring of settlement.
Keyword:No residue track; deformation monitoring; Pier engineering deformation monitoring ; The subgrade engineering deformation monitoring ; The tunnel engineering deformation monitoring
TOC \o 1-3 \h \z \u HYPERLINK \l _Toc295813826
您可能关注的文档
最近下载
- 电子对抗原理与技术(第3版)全套PPT课件.pptx
- 冷拼课件教学课件.pptx VIP
- 最新2025年秋开学第一课主题班会PPT课件(含抗战胜利80周年内容).ppt
- 22G101 三维彩色立体图集.docx VIP
- 2024年秋季新北师大版七年级上册数学全册教案设计.docx
- 吴清忠:人体复原工程.pdf VIP
- 川崎 Kawasaki 2022款 Z 400 中文用户手册 使用说明书2021年4月14日印刷.doc VIP
- [北京]冷轧带钢工程薄板酸轧设备基础施工方案.doc VIP
- 全国教学能力比赛《声临其境·影视配音要旨》教案(一等奖).pdf
- (高清版)DB36∕T 713-2013 高速公路红砂岩路基施工技术规范 .pdf VIP
文档评论(0)