- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
                        查看更多
                        
                    
                Slide Objective: This slide shows a sample architecture for medium sized organisations.  Instructor Notes:  For smaller sites all roles can be co-located for a single server deployment.  As multiple servers are required this is one option for architecture.  Mailbox Servers, Hub Transport  Client Access Server Roles – Can be co-located, but only the Mailbox Server Role can be installed on a cluster.  The mailbox servers can use LCR in this configuration for redundancy, but not CCR or SCC because they are co-located with Hub Transport  CAS roles which are not compatible with clustering (TBC)  Transport servers provide automatic redundancy within the same site.  The Hub Transport Server Role which is co-located on the same server as the Mailbox Server Role will be preferred for that Mailbox Server Role, but if a failover were to occur then the other HT in the site will be utilized.  The CAS role will also be preferred for the Mailbox Server Role where it is co-located.  For external publishing in this scenario, ISA 2006 with ISA load balancing should be used to provide a single namespace and redundancy between the CAS servers, while maintaining affinity for Push notifications.  Edge Servers - are optional, but recommended for mail cleansing (anti-virus, anti-spam, compliance  policy application, etc) in the DMZ.  The Edge servers can be deployed at any stage, as they don’t require Exchange 2007.  Edge cannot be co-located.  Is optional  independent.  Information about scaling  mid sized organisations, etc...  Exchange 2003 Front-End servers will be replaced by Exchange 2007 Client Access Servers in functionality.  Clients will experience the level of functionality determined by their backend server. More details to come. * Slide Objective: This slide does a quick drill down into transitioning from Linkstate  Instructor Notes;  Routing changes recap By now you’re aware of the basics of E2K7 routing: ?         No more routing groups (except for legacy purposes) ?        
                您可能关注的文档
最近下载
- GB50351-2014 储罐区防火堤设计规范.docx VIP
- 曹冲称象的故事第4课时 称重大挑战 课件 人教版数学三年级上册.pptx VIP
- RS Components 电工电料 安全继电器 R1.188.3580.0 - SNO4083KM-A 使用说明.pdf VIP
- 三级安全教育登记表.pdf VIP
- 学校部分固定资产报废处置合同6篇.docx VIP
- 曹冲称象的故事第3课时 称重我很行 课件 人教版数学三年级上册.pptx VIP
- 清洁性间歇导尿评分标准.doc VIP
- 亮化重点项目施工组织设计.doc VIP
- 第四单元习作:笔尖流出的故事(技法+范文+素材)【技法精讲+范例精选】六年级语文上册单元作文能力提升(统编版).docx VIP
- 学校部分固定资产报废处置合同7篇.docx VIP
 原创力文档
原创力文档 
                        

文档评论(0)