目 录
1、编制说明·······················································3
2、工程概况·······················································4
3、施工准备·······················································4
3.1、技术准备·····················································3
3.2机具准备·······················································4
3.3、人员准备·····················································5
3.4、材料准备······················································5
3.5、材料要求······················································6
4、主要施工方法···················································6
4.1钢筋加工·······················································6
4.2、钢筋要求·····················································7
4.3钢筋加工要求···················································8
4.4钢筋抽样······················································9
4.5钢筋除锈的方法和设备···········································9
4.6钢筋连接······················································11
4.7钢筋绑扎·····················································17
4.8、保证保护层的措施············································30
5、季节性施工····················································32
5.1冬季施工······················································32
5.2雨季施工······················································32
6、质量要求······················································32
6.1允许偏差和检查方法············································32
6.2验收方法······················································33
6.3、应注意的问题·················································35
6.4成品保护措施··················································35
7、安全、环保及文明施工要求·······································36
7.1、安全文明施工措施·············································36
7.2、环保措施····················································39编制说明
编制目的、适用范围
编制依据
三都县县府西路改造开发项目3#楼施工图纸、洽商、规范标准以及施工现场的实际情况。
主要规范、规程
序号 规范、规程名称 规范、规程编号 1 混凝土结构工程施工质量验收规范 GB50204-2002 2 建筑地基基础工程施工质量验收规范 GB50202-2002 3 混凝土结构工程施工质量验收规范 GB50204-2002 4 建筑工程施工质量验收统一标准 GB50300-2001 5 混凝土质量控制标准 GB50164-92 6 混凝土结构施工
您可能关注的文档
- 三严三实忠诚干净担当专题教育党课讲稿三严三实忠诚干净担当专题教育党课讲稿.doc
- 三中简报2014年第7期(总第29期)三中简报2014年第7期(总第29期).doc
- 三亚农产品冷链物流如何“不掉链”三亚农产品冷链物流如何“不掉链”.doc
- 三中路线教育实践领导小组及方案三中路线教育实践领导小组及方案.doc
- 三严三实忠诚干净担当党课讲稿三严三实忠诚干净担当党课讲稿.docx
- 三亚凤凰机场看板计算书三亚凤凰机场看板计算书.doc
- 三亚新思想教育 高中 高二化学选修1复习提纲三亚新思想教育 高中 高二化学选修1复习提纲.doc
- 三位数乘一位数的连续进位乘法说课稿三位数乘一位数的连续进位乘法说课稿.doc
- 三元共生职教师资培养模式的研究三元共生职教师资培养模式的研究.doc
- 三公司群众路线教育实施方案(定)三公司群众路线教育实施方案(定).doc
- 六年级数学下册教学课件《解比例》.pptx
- 8.21.5 鸟类的生殖与发育(课件)八年级生物下册课件(苏教版).pptx
- 钠离子电池项目智能制造方案(范文参考).docx
- 2023-2024学年吉林省吉林市舒兰市七年级(上)期末语文试卷.docx
- 2024年吉林省吉林市丰满区亚桥实验学校中考数学三模试卷.docx
- 2023-2024学年吉林省辽源市东辽县七年级(上)期末英语试卷.docx
- 2023-2024学年吉林四平九年级数学第一学期期末水平检测试卷.docx
- 2023-2024学年吉林市蛟河市三校联考九年级(上)期末英语试卷.docx
- 2023-2024学年吉林松原九年级英语上册考场实战试卷.docx
- 电解液新材料项目智能制造方案.docx
最近下载
- 临床社会工作:优势视角模式形考任务三.docx VIP
- 《人类学概论》马工程 电子课件 第十章 人类学的应用.pptx
- 机车运用管理讲解.ppt
- 测度论讲义习题答案--严加安.pdf VIP
- COMMAND MODERN OPERATION 用户手册中文版.pdf VIP
- Biostar映泰B550GTQ 5.0 AB55A-M4T_(EN+KR+TC)_230620说明书用户手册.pdf
- 2023年喀什大学公共课《马克思主义基本原理概论》期末试卷A(有答案).docx VIP
- 天津中医药大学2022-2023学年第1学期《生物化学》期末试卷(B卷)附参考答案.docx
- Biostar映泰B550MH 6.1 AA52A-M4S & AB55A-M4S_CN (Ver6.1)_230619说明书用户手册.pdf
- 2023年喀什大学公共课《马克思主义基本原理概论》期末试卷B(有答案).docx VIP
文档评论(0)