主讲人: 徐西雨 关清源 孟 康 杜文旺 Part 1 Warm-up Activties 1. Assembly sequence of a prefabricated building. 按顺序装配的预制建筑。 The sequence is divided into four stages or phases: 这个顺序划分为四个阶段或部分: Ground is excavated 挖掘地基 Concrete foundations are constructed 混凝土基础构造 Column base plates are fixed 柱形基础板固定 Steel columns are erected 树立钢柱 Phase 1 First, the ground is excavated. Then, the concrete foundations are constructed. Later, the column base plates are fixed. Finally, the steel columns are erected. 首先,挖掘地基。然后,搭建混凝土基础构造。之后,确定柱形基础板。最后,树立钢柱。 Phase 2 Roof decking i