- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
This is a standard view of the procure to pay process and the most common. It may vary significantly based upon the company procedures, the products/services purchases and other factors. SAP allow businesses to tailor it to their needs. Starts with a requisition or need that needs to be filled. This can come from Planning (MRP), manually or other The purchase order is the document to fill the need: usually includes the vendor, cost/price, quantity, terms and other pertinent information. [ part one of the 3-way match] Notifying the vendor The goods are shipped and brought to the organization The goods are received (typically at the dock) and then put away [ part two of the three way match] An invoice is received from the vendor [third part of the 3-way match] After the tolerances/verification of the 3-way match are met a payment is made according to the terms agreed to on the purchase order. Requisitions can be created indirectly in the following ways: Via materials planning and control The component Consumption-Based Planning suggests materials that need to be ordered on the basis of past consumption or usage figures and existing stock levels. The order quantity and the delivery date are determined automatically. Via networks (from the component PS Project System) Requisitions are generated automatically from networks if: A material component with non-stock material or an external service component has been assigned to an operation and the indicator allowing automatic generation of requisitions immediately the network is saved has been set in the network. Via maintenance orders Requisitions are generated automatically from maintenance orders if: A material component with non-stock material has been assigned to an operation, or An operation with the control key for external services has been created. For further information, refer to the section Planning of an Order in the PM Maintenance Orders documentation. Via production orders (from the component PP Product
您可能关注的文档
最近下载
- 2024-2025学年初中信息技术(信息科技)七年级上册北师大版(2024)教学设计合集.docx
- 高中政治2024届高考热点问题分类讲解与练习(低空经济).pdf VIP
- 走向辉煌2011高考语文阅读飞跃与写作创新.pdf VIP
- 专题04 低空经济-2025年高考政治时政热点押题预测(全国通用)(原卷版).docx VIP
- 专题十五 低空经济 数字经济 -2024年高考政治时政专题必刷卷(解析版).docx VIP
- 投标答辩述标PPT.pptx VIP
- 2025年机动车检测站检测员理论培训测试试卷含答案.docx VIP
- 科研伦理与学术规范(北京师范)中国大学MOOC慕课 客观题答案.pdf VIP
- 网课超星学习通英美文学及选读尔雅答案.docx VIP
- 低空经济-经济科技2025年高考政治时事热点解读(附答案解析).docx VIP
文档评论(0)