- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
designbeamandcolumdesignbeamandcolum
Introduction and theoretical discussion
Load calculation: bending moment and shear force for beams and columns
1. Design of reinforced concrete continuous beam
a) Ultimate limit state of BEAM
b) Service limit state
c) Detailing of reinforcement of BEAM
2. Design of column and detailing
A) The calculation of COLUMN
B) Detailing of reinforcement of COLUMN.
Discussion and conclusion on the design
Format, presentation and reference
Introduction
In this assignment, reinforced concrete will be used to construct the supporting frame of a three-storey shop lot. My design is a continuous beam and a column manually in accordance with the British Stardards. The choice of beam and dimension of the frame is based on the last three digits of my passport number. The slab of the building is designed as one way slab, and the weight of slab is distributed in the global y direction as shown in Figure 1. The beams are represented by solid lines while solid rectangles show the location of columns. The beams on grid A-C/2 and A-C/4 are secondary beams supported by the main beams.
Theoretical discussion
My passport number last three is 764. So, w=7, x=6, y=4.
W=7 as odds number:
a. Design the continuous beam 2/A-C
b. Design the column 2/B from first floor to second floor
The design specifications is given by assignment. That we can know:
1. All elements are to have a fire resistance period of 2 hours
2. Loading condition:
i. Roof imposed load = 1.5 kN/m2
ii. Floor imposed load = 3.0 kN/m2
iii. Roof finishes = 1.5 kN/m2
iv. Floor finishes, partitions, ceilings, services = 3.0 kN/m2
3. Slabs are solid with a thickness of 180 mm
4. The load due to self-weight is estimated from preliminary sizing of members. The preliminary size of beam can be taken as 300x400 mm, and the column 350x350 mm
5. The exterior of building is exposed to moderate condition while the interior is exposed to mild condition
您可能关注的文档
最近下载
- LNGT88J永磁合金工艺研究.docx VIP
- 最校苏教版五年级数学同步思维训练(上册).pdf VIP
- 外研版高中英语选择性必修一Unit-3-The-road-to-success.pptx VIP
- 众兴菌业培训课件.pptx VIP
- 房地产市场年报-2020年天津市房地产市场年报.pdf VIP
- 1. 香港公司註冊證明書.pdf VIP
- 【港交所-2025研报】卓能(集团) 截至二零二四年十二月三十一日止六个月中期业绩报告.pdf VIP
- 2025四川内江市隆昌市兴晟产业投资集团有限公司招聘13人考试备考题库及答案解析.docx VIP
- ISO9001、ISO14001、ISO45001三标一体内部审核检查表.pdf VIP
- 2019年天津房地产市场回顾及2020年展望 .pdf VIP
文档评论(0)