- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DynamicmanagementwithscheduleandlaborcontractasthebasisoftheprincipleDynamicmanagementwithscheduleandlaborcontractasthebasisoftheprinciple
Dynamic management with schedule and labor contract as the basis of the principle.
2. The rigger engaged in hoisting machinery operations, scaffolder engaging in the operations in which high erection, are prone to personnel casualty accidents, to the operator himself, others and the surrounding facilities safety significant danger.
3. The rigger and scaffolder belong to special operations personnel, according to the relevant provisions of the special operations personnel must hold relevant certificates.
4. General accident means killed 3 people below, the following serious injury accident or 10 people.
5. The main content of the hoisting plan should also include schedule; Resource planning (including human, machine, material, etc.); Safety technical measures; Risk assessment and contingency plans, etc.
1 P338
Case 1 h420070-2 】 【
Third, analysis and reference answer
1. The lifting device or component of the main causes of instability: design with a lifting force, small stiffness of equipment or components. Preventive measures: the long and thin, large equipment or components using lifting point hoisting; Thin wall equipment for reinforcement to strengthen; The weak parts of the steel structure, space truss structure or bar to reinforce or enlarging section.
2. A, materials to the project before the material supply department intends to submit the material demand plan, and after approval and supply department, before picking; Second, according to the examination and approval of material demand plan for acquisition; Thirdly, after the construction of surplus materials shall be handled in a timely manner to withdrawing money.
3. A, establish and perfect the system of the project material consumption and supply plan; Two, strictly implement the system of material use quota acquisition.
4. ABC classification and value engineering methods to save material, the role of is: the role played by the ABC classification is to find the focus of material management. The
您可能关注的文档
- CloudResearch(云服务)_26.doc
- CMA学习考试内容 (2015年起实施的新大纲).doc
- CN101327945A 纳米氧化铜.doc
- CMD操作命令.doc
- CMG-关键字.doc
- CNAS—AI03:2011检查机构认可领域分类.doc
- CNN Questions (China).doc
- Coal gasification The clean energy of the future.doc
- CNPC countries中油海外合作国家.doc
- Collaborative policymaking.doc
- Dynamic Coupling of Computational Fluid Dynamics and Thermodynamics Software.doc
- d监理实用手册施工阶段的建筑材料管理_secret.doc
- Dysmenorrhea.doc
- E-英语单词构词法 前缀.doc
- Easter day.doc
- easyui行编辑.doc
- EAST文档管理系统用户操作手册.doc
- EB-5美国投资移民ABC入门课 小白必读.doc
- EBZ260掘进机安装安全技术措施.doc
- ECMT 5001 Year 2008 Semester 2_ECMT 5001 Solution Tutorial 6.doc
文档评论(0)