publiceducationindustrialoutreach.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
publiceducation

PUBLIC EDUCATION INDUSTRIAL OUTREACH PUBLIC EDUCATION INDUSTRIAL OUTREACH QUALITATIVE RESULTS Municipality: City of Orinda Permit Year: (2008/2009) Introduction: The City of Orinda (the City) regards public education about protecting surface water quality as a key component of the municipal NPDES program. Without education of our residents, including school-age children to grandparent-age adults, our creeks would not be as clean and free-flowing as they are. In the 2007-2008 annual report, we stated that the goals for the 2008-2009 fiscal year were pending issuance of the Municipal Regional Permit. Since that issuance did not occur, we undertook similar Public Education and Industrial Outreach (PEIO) activities as last year, which augment those conducted by the Contra Costa Clean Water Program (Program). These efforts have resulted in better-educated residents and business owners in the City whose awareness was raised regarding: ? Causes and effects of stormwater pollution, ? Differences between the sanitary sewer and the storm drain system, ? How to protect our many creeks and two watersheds through participation in ongoing creek restoration efforts and daily actions, and ? Adoption of less polluting and more environmentally sensitive practices. Implementation Evaluation: Participation in PEIO Subcommittee and Program Activities Implementation of PEIO activities was performed primarily by the Stormwater Program Manager (Cathleen Terentieff). As the primary staff responsible for implementing PEIO activities, the Stormwater Program Manager is the designated representative responsible for implementation of the PEIO performance standards in conjunction with Program activities and for acting as a liaison with the PEIO Subcommittee. The Stormwater Program Manager works closely with the Planning Department staff, the IDCA Inspector, the Contra Costa County Sanitary District (CCCSD) inspector, and the County Building Inspection Departme

文档评论(0)

guanjie8song + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档