FIDIC 设计、施工和运营合同条件-金皮书英文-2008.doc

FIDIC 设计、施工和运营合同条件-金皮书英文-2008.doc

  1. 1、本文档共123页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
FIDIC合同金皮书英文版

FIDIC CONDITIONS OF CONTRACT FOR DESIGN, BUILD AND OPERATE PROJECTSFIDIC GOLD BOOK 2008 FIRST EDITION Contents 1 General Provisions 1 1.1 Definition 1 1.2 Interpretation 8 1.3 Notice and other Communications 8 1.4 Law and Language 9 1.5 Priority of documents 9 1.6 Contract Agreement 10 1.7 Operating License 10 1.8 Assignment 10 1.9 Care and supply of Documents 11 1.10 Errors in the Employer’s Requirements 11 1.11 Employer’s Use of Contractor’s Documents 12 1.12 Contractor’s Use of Employer’s Documents 12 1.13 Confidential Details 13 1.14 Compliance with Laws 13 1.15 Joint and Several Liability 14 2 The Employer 14 2.1 Right of Access to the Site 14 2.2 Permits, Licences or Approvals 15 2.3 Employer’s Personnel 16 2.4 Employer’s Financial Arrangements 16 3. The Employer’s Representative 17 3.1 Employer’s Representative’s Duties and Authority 17 3.2 Delegation by the Employer’s Representative 17 3.3 Instructions of the Employer’s Representative 18 3.4 Replacement of the Employer’s Representative 19 3.5 Determinations 19 4 The Contractor 19 4.1 Contractor’s General Obligations 19 4.2 Performance Security 20 4.3 Contractor’s Representative 22 4.4 Subcontractors 23 4.5 Nominated Subcontractors 23 4.6 Co-operation 23 4.7 Setting-out 24 4.8 Safety Procedures 25 4.9 Quality Assurance 25 4.10 Site Data 26 4.11 Sufficiency of the Accepted Contract Amount 26 4.12 Unforeseeable Physical Conditions 27 4.13 Rights of Way and Facilities 27 4.14 Avoidance of Interference 28 4.15 Access Route 28 4.16 Transport of Goods 28 4.17 Contractor’s Equipment 29 4.18 Protection of the Environment 29 4.19 Electricity, Water and Gas 29 4.20 Employer’s Equipment and Free-Issue Materials 30 4.21 Progress Reports 31 4.22 Security of the Site 32 4.23 Contractor’s Operations on Site 32 4.24 Fossils 33 4.25 Changes in the Contractor’s Financial Situation 33 5 Design 33 5.1 General Design Obligations 33 5.2 Contractor’s Documents 34 5.3Contractor’s Undertaking 36 5.4 Technical Standards and Regulati

您可能关注的文档

文档评论(0)

almeida + 关注
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档